Skip to content


Taking it to the Streets: Vacant, unoccupied, abandoned

No comments

 

What at the Projected Operational Risks? Do they Matter? Photo:CJ Naum, 2013

 
Taking it to the Streets
Vacant, unoccupied, abandoned and derelict buildings continue to challenge emergency response companies at incidents. It’s the buildings of Heritage – masonry construction with Heavy Timber, Mill, Semi-Mill or Ordinary Construction systems of three to six to eight story heights that create the most significant risks to operations, mitigation, safety and integrity.

Do you know what the inherent characteristics and risks are for each system and occupancy condition?

Do you train on when and how to establish collapse management zones (CMZ), how to manage them and what indicators to monitor and track?
 
The identification, establishment and control of collapse management zones continues to be a leading Fireground performance deficient area requiring greater Fire
Service attention, training and rigor.
 
Understand the Difference between Occupancy Risk versus Occupancy Type?
 
Take a look at the building presented in the photo: discuss what the possible building construction features and systems are and why.
  • What type of Collapse Management Zones (CMZ) can be expected both interior and perimeter?
  • What would the expected fire flow requirements be with heavy fire involvement and extension?
  • What are other operational risks to operational companies and personnel?
  • How and when would Collapse Management Zones (CMZ) be established?
  • Who would manage them and how?
  • Is there a problem controlling Collapse Zones?
  • And the obvious question: How does the buildings’s assumed condition:Vacant, unoccupied, abandoned and derelict buildings affect your Incident Action Plan, Strategies and Tactics? Or is it not a factor…..How do you determine when and how to commit to interior operations?

For incident deployments to a report of a structure fire, the single most important attribute that defines all phases of subsequent operations and incident management; is that of understanding the building. 

An officer or commander’s skill set, comprehension and intellect in their ability to read a building is paramount towards identifying risks, conducting fluid assessment, probability, predictability and recognizing intrinsic characteristics of the building and its expected performance under fire conditions, which are essential toward development of an integrated and adaptive fire management model and flexible incident action plan.

If you don’t know and understand the building, how can you identify and select appropriate strategies and tactics and have an integrate IAP suitable for the building and occupancy risks and predictability of performance? 

It’s much more than just arriving on location, identifying a single family wood frame residential, a three story brick or a five story fireproof or single URM commercial and stretching in and going to work.

 

NIOSH: Preventing Deaths and Injuries of Fire Fighters using Risk Management Principles at Structure Fires HERE

 

The First-Due and Buildings on fire

No comments

 

The First-Due and Buildings on fire

The First-Due and Buildings on fire
The ability for the first-arriving company, company officer or commander to perform an accurate identification of building type and classification are formulative toward anticipating variables in structural integrity and resiliency to the effects of extreme fire behavior, accelerated fire load package growth rates and intensity levels typically encountered in today’s composition and arrangement of buildings and their associated construction systems during initial and sustained fire suppression.

Arriving companies and personnel at a structure fire must be able to rapidly and accurately identify key elements of a building, process that data based on a widening field of variables present on today’s evolving Fireground and implement timely actions that address prioritized actions requiring intervention.

Building Performance

The identification, assessment, probability, predictability and intrinsic characteristics of the building and its expected performance under fire conditions must be identified, assessed and integrated into an adaptive fire management model and flexible incident action plan.

In other words, arriving companies and personnel at a structure fire need to be able to rapidly and accurately identify key elements of a building, process that data based upon a widening field of variables present on today’s evolving fireground and implement timely actions that address prioritized actions requiring intervention.   Deterministic fireground models for size-up and suppression have to give way to a more expandable stochastic model of assessment. Key to this is having a broad and well developed foundation of building knowledge.

  • Link to recent article, HERE

The Compartment and the Company

No comments

 

The Compartment and the Company:
Tactical Fireground successes are measured by the abilities, determination and fortitude of the Company and the leadership of the Company Officer to interface with the evolving fire conditions within the Compartment and Envelope of the Building.If the Company understands and knows the buildings and occupancy risks of its first-due; can efficiently assess the building and corresponding fire conditions and can
recognize hazards, risks and operational vulnerabilities; align tactical priorities and execute tasks with precision and proficiencies, then there is a high degree of confidence strategic objectives can be achieved and the incident mitigated with limited adverse collateral.

How effective are you as an officer?

  • How about the other officers?
  • What about the company?
  • Capable, skilled, proficient?
  • Does your officer and company take time to look over the building (interior/ exterior) once an incident, alarm or run is done?

Are you “looking” at key issues that affect the Building? Start reexamining the compartment and your company: risk and capabilities, it’s that important.

The most important element on the Fireground

Taking it to the Streets: “All Companies Stand-By”: Transmitting the Box for….Your Street on this Day

No comments

 

Transmitting the Box

Taking it to the Streets: “All units stand-by: Transmitting the Box for….Your Street on this DayThe importance of knowing your first-due, surrounding response districts, as well as greater alarm, mutual and automatic aid response areas …is fundamental towards achieving operational excellence and maintaining firefighter safety.

The fact that at times, our surroundings do become a blur and fade into the background does occur and should be recognized as a gap and corrected.

Company and Command Officer Responsibilities demand that you know your buildings intimately and have the knowledge base and experience to put Building Construction, Occupancy, Fire in the Compartment and Strategies & Tactics together in an orchestrated manner consistent with risk, demands and requirements dictated by the evolving incident.You know that quiet street you pass daily on your way to “other runs”, or that may not have necessarily required agency service in a while; have you looked at the construction and building features before you’re now showing up first-due with heavy fire showing, and multiple incident priorities all demanding immediate attention?

Take a look at the images from our past post and this one; run through your head what the street looks like (pre-event) and what parameters and factors you’re seeing. Do the same with the fire incident scene and see if you can match pre-incident situational awareness and pre-fire planning insights with what you might be confronting from the front seat or riding backwards….Understand and Know your world….it’s just a matter of time before those bells will be going off and the radio will be crackling….Engine 21 respond to…. For a report of a structure fire.

  • Checkout other interactions on Buildingsonfire on Facebook HERE and don’t forget to to LIKE and pass the link along

Taking it to the Streets: Your Street on any given Day

No comments

 

Are you Aware of your Surroundings?

 
Taking it to the Streets: Your Street on any given Day
At times, our surroundings become a blur and fade into the fabric that defines our response district, our first-due, our neighborhood, community, city or town. We tend to focus on thos…e areas that have an immediacy or frequency that defines day-to –day operations, shifts or alarm dispatches and transmission of “those” box alarms. You know; the ones that have a particular address that always grab our attention.

Company and Command Officers MUST be intensely aware of your area’s fabric, its state and condition, the subtle changes as well as those that a times result in what seems like major changes, renovations or construction that pops up literally overnight or in a matter of weeks. Individually, you should be running scenario through your head as to the “what ifs” for a particular building, structure or occupancy. Share these insights and option plays with your company, station, battalion or group…Invest in the opportunity to game plan and know your world; before the alarms go off and the bell hits and you’re in the street….

Understand how your buildings co-exist with each other, what defines their characteristics, features, profile, hazards and challenges…

This is Part One of a Two Part Post….”All units standby: transmitting the box for….”

  • Checkout other interactions on Buildingsonfire on Facebook HERE and don’t forget to to LIKE and pass the link along

Auto Parts Store Roof Collapse Double LODD 1996

No comments

Roof Collapse Chesapeake VA 1996 Double LODD

OVERVIEW

On March 18, 1996, two firefighters were killed in Chesapeake, Virginia when they became trapped by a rapidly spreading fire in an auto parts store and a pre-engineered wood truss roof assembly collapsed on them. The cause of the fire was an electrical short created when a power company truck working in the rear of the building drove away with its boom in an elevated position, accidentally pulling an electrical feed line from the main breaker panel at the rear of the store.

Post-incident investigations indicate that the electrical fault may have sparked multiple points of fire origin throughout the roof structure of the building, due to improperly grounded wiring. At the time of the report issuance, this was exemplified as another incident illustrating the rapid failure of lightweight construction systems when key support components are involved in a fire. The report pointed out the importance of prefire planning and accurate size up by fire companies to determine the risk factors associated with a fire in this type of construction.

Lessons regarding importance of initial company actions, constant re-evaluation of action plans, strong command and coordination of units on the fireground, and recognition of signs of impending structural failure were also reinforced.

Reading through any number of NIOSH, USFA or NFPA reports, similar issues, challenges and operational factors resonate and continue to shape and challenge today’s fire ground operations.

It is without exception that the knowledge and insights being gained by the continuing efforts from the UL and NIST Research Studies coupled with the recommendations, from the NIOSH Fire Fighter Fatality Investigation and Prevention Program (HERE) will provide increased awareness and understanding of buildings, fire dynamics and the effectives of fire within the compartment, building and the manner in which fire departments engage in fire suppression operations.

Today’s fire ground is changing at a very rapid pace as it relates to the continued evolution, transition of engineered structural components and systems (ESS).

Are you prepared, knowledgeable and understand that new strategic and tactical approaches are required?

One of the most significant actions initiated by the Chesapeake Fire Department was the implementation of a Truss Identification Program (TIP).

Take a look at a past posting on CommandSafety.com where we published on an overview a few years ago of truss and engineering component systems across the United States HERE.

City of Chesapeake (VA) Truss ID Program, HERE

The following are excerpts and narrative from the USFA Technical Report Series TR-087 and NIOSH Report 96-17

Aerail Overview on Complex today

 

SUMMARY OF KEY ISSUES

Staffing : The first alarm response provided a small attack force with limited capabilities. The full response brought only 10 personnel.

Size-up : The first arriving company officer was not able to determine the location and extent of the hidden fire.

Pre-fire plan information: This complex required a pre-fire plan due to the complex arrangement, multiple occupancies, mixed construction, lack of fixed protection, limited access and difficult water supply problems. The first-due company did carry a pre-fire plan that showed the layout of the shopping center and the floor plan for the auto parts store, but the prefire plan was not referenced by the crew during the fire.

Delayed response: The first arriving company was on the scene alone for several minutes with only 3 personnel. The back-up companies had long response times. The lack of evidence of a working fire prompted the initial incident commander to return some of the responding units, resulting in even longer response times.

Water supply: The first-in company did not establish a water supply. This required the second engine company to be committed to this task.

Incident command: The battalion chief was faced with a complicated and rapidly changing situation. He was not able to effectively transfer command from the initial officer and direct the operations of widely separated units.

Operational risk management:The officers involved in the initial part of the operation had to make critical risk management decisions with limited information.

Accountability: Accountability for the personnel operating in the hazardous area was not established prior to the structural collapse. As the situation became critical, no one realized that a crew was still inside the building.

Rapid intervention crew: Additional crews did not arrive in time to assist the crew that was in trouble inside the building.

Radio communications: The lack of a clear radio channel for fire ground communications caused serious problems with command and control of the incident, including the failure to maintain communications with the crew inside and the failure to hear their request for assistance.

Lightweight construction: The roof collapsed quickly and with very little warning. This should be anticipated with a lightweight wood truss roof assembly. This hazard was not recognized by the crews on the scene.

BUILDING DESCRIPTIONConstruction and History

The fire occurred in a modern, lightweight construction building that was added to an existing strip mall in 1984. The older mall on exposure side four was separated from the fire building by a masonry fire wall and was constructed with masonry walls and a steel bar-joist roof structure. The exposures on side two consisted of additional stores that were similar in construction to the auto parts store. There were no exposures on sides one and three.

The auto parts store was constructed with two masonry exterior walls and two wood frame exterior walls, with a lightweight wood truss roof assembly. It was approximately 120 feet deep and 50 feet wide, providing about 6,000 square feet of open display and storage space. The roof assembly was a pre-engineered lightweight wood truss assembled from 2 x 6 top and bottom chords, with 2 x 4 web members held together with metal gusset plates.

  • There were no interior bearing walls or supports for the roof structure. At one end, the trusses were supported by a wood plate that was bolted to a metal beam.
  • The other end rested on top of the concrete block wall. Each truss was separated by 24 inches and they were covered with 1/2 inch CDX plywood sheathing under a two-ply rubber membrane.
  • A drywall ceiling was attached to the underside of the trusses, creating a truss void space (truss loft) 24 to 36 inches above the ceiling.
  • A sheet rock divider was located in the middle of the truss void as a draft stop. The roof had a slight pitch.
  • Three air handling units were on the roof of the building, with an estimated combined weight of 3,000 pounds. It is not known when these units were installed and they may have represented an unanticipated dead load on the roof assembly.
  • There was no indication that the trusses had been reinforced to support the extra weight of these units.
  • The original truss roof structure collapsed during the construction of the building, injuring three workers.
  • Most of the trusses were damaged and had to be replaced at the time. The fire building was occupied by Advance Auto Parts, a chain distributor of automobile part and lubricants. The store was designed with an open retail area containing display racks for goods.
  • A long counter ran from front to back behind which was shelving for additional auto parts. Waste oil and batteries were kept in a rear storage area separated from the front of the store by a drywall wall.
  • The southwest corner of the building contained employee restrooms which had a small water heater located in the ceiling space just above them. The main entrance to the store was through two large glass doors at the front of the building. A delivery and service entrance was located in the rear and a 40 foot trailer was parked behind the building and used for additional storage.

THE FIRE

At approximately 11:00 a.m. on March 18, 1996, a power company employee set up a service truck at the rear of the Indian River Shopping Center in Chesapeake, Virginia. The worker was going to disconnect the electrical power to a customer who had not paid an electrical bill. The customer, a cocktail lounge and bar, was located adjacent to Advance Auto Parts. In preparing to disconnect service, the power company worker elevated the articulating boom on his truck to roof level. Faced with the immediate loss of power, an employee of the lounge paid the electrical bill while the power company employee was beginning work, and went to the back of the store to show the receipt.

A stamped receipt indicates the bill was paid at 11:16 a.m. at a supermarket also located in the shopping center. The power company employee, working from the bucket of the articulating boom, lowered the boom and verified the receipt. Although the bucket had been lowered, the hinged elbow of the articulating boom remained elevated. The employee then radioed his supervisor from the cab of his truck, and received instructions not to disconnect power.

The power company employee then attempted to drive the service truck away, forgetting to secure the boom, which snagged on a power line feeding the meter at the rear of the Advance Auto Parts Store. This caused a phase-to-phase and phase-to-ground arcing fault at the store’s electrical meter, starting the fire. The power company employee immediately stopped, exited his truck, and cut the remaining power connections to the meter at the rear of Advance Auto Parts.

Initial Actions Prior to Calling 911

After cutting the power line to the building, the power company employee removed the meter, noticed smoke coming from the meter base, notified his office and requested that another power company crew and a supervisor come and assist him.

  • An employee of the Advance Auto Parts Store came to the rear of the building and met the power company employee, telling him that the store had lost electrical power and that a fire was being extinguished inside the building.
  • Another Advance Auto Parts employee discharged a dry chemical fire extinguisher on the spot fire that had started near the hot water heater above the employee restrooms.
  • All believed the fire had been extinguished at this time.
  • At 11:29 a.m., the Chesapeake Fire and Police Emergency Operations Center received a 911 call from Advance Auto Parts reporting a problem with the fuse box in the store.
  • The Chesapeake Fire Department was dispatched to a report of a fuse box sparking at 4345 Indian River Road at the Advance Auto Parts store.

Emergency Response

  • Initial response consisted of two engines, a ladder company, and a battalion chief, for a total of 10 personnel.
  • Engine 3 was the first due arriving company, responding from quarters. Engine 1 and Ladder 2 also responded.
  • Battalion 1 was dispatched as the command officer, but requested that Battalion 2 cover the assignment, since he was out of position.
  • Battalion 2 acknowledged the request, and he responded with the first alarm companies.
  • Engine 3’s crew consisted of three personnel: a driver/pump operator; Firefighter- Specialist John Hudgins, serving as Acting Lieutenant for the shift; and Firefighter- Specialist Frank Young, detailed to the station for the day, was riding in the jump seat. Engine 3 was responding in a reserve engine that had a 500 gallon water tank.

 

Initial Size-Up and Company Actions

At approximately 11:35 a.m., about five and a half minutes after dispatch, Engine 3 arrived on the scene at the front of the strip mall.

  • Hudgins reported “a single-story commercial structure, nothing showing from the front. Engine 3 is in command.”
  • Engine 3 took a position in front of the Advance Auto Parts Store. Hudgins and Young entered the structure from the front of the building to investigate.
  • Conditions were clear in the store, and there was no visible smoke or flames showing. They discovered light smoke near the electrical panel in the rear of the building, and radioed to Battalion 2 that they had a fire and were checking for extension.
  • Acting Lieutenant Hudgins then radioed for Engine 3’s driver to reposition the apparatus to the rear of the building.
  • Hudgins then radioed to Battalion 2, who had not yet arrived on the scene, that Engine 3 and Ladder 2 could handle the incident. Battalion 2 and Engine 1, the second due engine company, both went in service.

Engine 3 Reports They Are Trapped, Roof Collapses

At approximately 11:49 a.m., almost 20 minutes after the initial dispatch time, Hudgins radioed that he and Young could not get out of the building. Battalion 2 radioed back that he could not understand their transmission. Hudgins then radioed that they needed someone to come to the front of the building and get them out. Again unable to understand their transmission, Battalion 2 radioed for any unit on the fireground to advise him if they heard the message that was transmitted.

  • Engine 4 responded that they were unable to copy the transmission.
  • Engine 14 then marked on the scene and was instructed by Battalion 2 to lay a supply line to the front of the building. Battalion 1, enroute to the fire on the second alarm, radioed to Battalion 2 that it sounded like someone was trapped inside.
  • Battalion 3, also enroute, radioed that he would be on the scene momentarily and would assist.

At this time, Ladder 2’s crew was setting the outriggers and preparing to elevate their aerial ladder for defensive operations.

  • In the short time it took to accomplish the stabilization of the ladder truck, the front of the store became fully involved, the building contents ignited, and the roof collapsed.
  • Due to the radiant heat, Ladder 2 was forced to retract their outriggers and reposition to a safer defensive position on side one of the structure, and set up the aerial again.
  • Ladder 2’s crew did not hear Engine 3’s transmission that they were trapped.
  • Simultaneously, Engine 1 ran out of supply line about 200 feet short of the hydrant. Engine 2, responding on the second alarm, picked up the hydrant that Engine 1 was attempting to reach and laid a supply line to side one.
  • The driver of Engine 1 attempted to contact his officer by radio to advise that he could not reach the hydrant, but could not get through due to heavy radio traffic.
  • He parked the engine in the roadway, donned his SCBA, and went to the rear of the building to report to his Captain and rejoin his crew.
  • Battalion 3 arrived on side one about this time and radioed for all companies to switch to channel two, an alternate fireground tactical frequency.

Driven by the northerly wind and the draft created by the burning contents of the structure, the fire at the rear had grown in such intensity that personnel were forced to move Engine 3. Assisted by employees of the power company, Engine 3 was moved back away from the rear of the building. At 11:55 a.m., about 26 minutes after dispatch, the Captain of Engine 1, with his crew at the rear of the building, confirmed to Battalion 2 that “I got men on the inside from Engine 3, and the lines have been burned. I do not know their status, and we still have no water to go in after them.”

Battalion 3 met with Battalion 2 and discussed that they may have lost a crew inside. Battalion 3 assumed command and Battalion 2 went to the rear of the building to coordinate rescue efforts. There, Battalion 2 met with the Captain from Engine 1.

By this time, the building was fully involved and no rescue efforts could be mounted until the fire was knocked down. Officers at the front and the rear attempted to conduct a personnel accountability report (PAR) to determine who was missing and where they might be located.

  • An engine company responding on mutual aid from the Virginia Beach Fire Department was flagged down, connected to Engine 1’s supply line, and completed the water supply to a hydrant behind the shopping center within the City of Virginia Beach. Engine 3 was forced to move back once again, and the supply line was disconnected from Engine 3 and used to supply water to Engine 4, a telesquirt that was positioned for defensive operations at the rear.

Extinguishment and Body Recovery

The fire spread to the attic of the exposures on side two and was held in check by the fire wall on side four of the building. The fire was brought under control as the contents of the auto parts store burned off and several aerial streams were put into operation. After the fire was extinguished, a search for the missing firefighters was initiated. After the bodies of the firefighters were located, they were removed from the fire building by members of the Virginia Beach Fire Department, and transferred by members of the Chesapeake Fire Department to medic units.

The body recovery was supervised by the Chesapeake Fire Department Fire Marshal’s Office and documented. An investigation was immediately started by the Chesapeake Fire Department Fire Marshal.

ANALYSIS

Fire Cause and Flame Spread

  • The fire was caused by the electrical short created when the power company truck struck the power line to the building. Investigation by the City of Chesapeake Electrical Inspector after the fire revealed that the meter contained wiring that appeared to have been tampered with and did not comply with the electrical code.
  • Several connections at the meter had been double-lugged, connecting multiple wires to single terminals. Additional investigation by Virginia Power revealed that the building may have been improperly grounded, leading to numerous hot connections when the short circuit occurred. The main fuse did not trip at the breaker panel and the wiring on all three air handling units had been fused. This probably resulted in the ignition of multiple spot fires in the truss loft above the store.
  • It appears that the fires in the truss loft were still relatively minor when Engine 3 arrived, but the fire spread rapidly throughout the space due to the light wood construction.
  • The wind drawn from the open doors at the front of the building also promoted rapid fire growth. This would have created a tremendous hidden fire in the wood truss loft area despite clear conditions inside the structure.
  • Reports of heavy smoke and fire conditions on the roof at the same time Engine 3’s crew was calling for pike poles and personnel to come inside are indications towards this scenario.
  • The interior of the auto parts store contained racks of auto parts and supplies, including oil, lubricants, rubber, and plastic parts. The contents were packed closely together and stored in tall racks near the ceiling.
  • Once the fire had broken through the ceiling in the rear of the building, these contents would have quickly reached their ignition temperatures, creating flashover conditions in the rear of the store as the fire progressed, trapping the firefighters and forcing them to seek an exit at the front of the store.

Roof Collapse

  • The collapse of the pre-engineered truss roof occurred approximately 21 minutes after the time of dispatch, and within 35 minutes of the initial accident, that caused the electrical short.
  • The structure appears to have collapsed within 10 to 12 minutes after the truss space became heavily involved.
  • The collapse of similar truss assemblies under fire conditions within this time period has been well documented.
  • Post-incident investigations indicate that this truss assembly may have been weakened by deficiencies in the connection of the trusses to the beam on the east side of the building.
  • Also, the dead load of the three air conditioning units may have contributed to the rapid failure of the roof.
  • Reports from firefighters on the scene indicate that a partial failure of the truss assembly may have occurred in the rear of the building, followed shortly by the failure of the entire roof assembly.
  • It is possible that the crew of Engine 3 was trapped by the partial collapse of the roof in the rear, or by the collapse of racks containing auto parts in the building, or by the rapid spread of the fire and smoke which had broken through the ceiling.
  • It is also possible that a combination of these events occurred simultaneously. The failure of the entire roof assembly and complete involvement of the interior of the building with fire took place within one minute after the firefighters radioed for help, before any reaction to assist them could take place.

Fire Operations

 

Initial Response - The first alarm assignment was overwhelmed by the situation, the circumstances, and the unusual sequence of events that occurred at this incident. It is evident that a larger force would have been needed to initiate an effective offensive or defensive operation for a working fire in a 6,000 square foot commercial occupancy, with attached exposures on two sides, with or without the unusual complications.

  • The response of two engine companies, one ladder company and a battalion chief, provided a total of 25 only 10 personnel on the initial assignment.
  • The individual companies, which responded with three person crews, had limited capabilities to perform tasks independently.
  • This incident generated only a single call to 9-1-1 reporting an electrical problem.

 

LESSONS LEARNED AND REINFORCED

1. RISK ASSESSMENT is the primary responsibility of the incident commander.

This incident presented a very high risk to the firefighters who were attempting to make an interior attack. However, the risk factors were not recognized and the interior crew was not directed to abandon the building. Risk assessment should be a continual process, particularly when a situation is changing very quickly.

2. ACCOUNTABILITY is an essential function of the Incident Command System.

The location and operation of the initial attack crew was not tracked according to the incident command system that was in effect at the time of the fire. The system must keep track of the location, function, status, and assignment of every individual unit or company operating at the scene of an emergency incident. In order to be effective, the accountability process must be routinely initiated at the beginning of every incident and updated as the incident progresses and units are reassigned to different tasks.

3. TACTICAL RADIO CHANNELS are essential for firefighter safety.

The fireground operations were conducted on the same radio channel as the routine dispatch and transfer of additional units, hampering the fireground communications during the important early stages of the incident. Designated radio channels should be set aside specifically for communications between the incident commander and the units operating at the scene of an incident. The exchange of information, orders, instructions, warnings, and progress reports is essential to support safe and effective operations. Tactical channels should be assigned early and routinely to avoid the confusion that occurs when units that are already working are directed to switch to a different radio channel.

4. FIRE OPERATIONS must be limited to those functions that can be performed safely with the number of personnel that are available at the scene of an incident.

The initial response to this incident did not provide enough resources to safely initiate an effective interior attack for the situation that was encountered. The first arriving company initiated interior operations that could not be adequately performed or supported with the limited number of personnel at the scene or responding. The delayed arrival of back-up companies increased the risk exposure of the first due company. The situation called for a more conservative initial attack plan and/or an early retreat when the magnitude of the fire became evident.

5. WATER SUPPLY is a critical component of a safe and successful operation.

The failed attempt to establish an adequate and reliable water supply for the interior attack was a critical problem at this incident. This task occupied the second due engine company which was needed to provide either a back-up hose line to support the interior attack or a rapid intervention crew.

6. LIGHTWEIGHT WOOD TRUSS CONSTRUCTION is prone to rapid failure under fire conditions.

If the construction of the building had been known or recognized, the early failure of the roof structure should have been anticipated and the interior crew should have been withdrawn. This requires pre-fire planning to identify high risk properties and a reliable system to label the building or to inform the responding units of the risk factors of the building. It is usually difficult or impossible to make this determination when the building is burning.

Aerial View of the Current Auto Parts Store 2010

 

USFA Technical Report Series Incident Report: Tr-087 NFPA 1996 Report Summary Sheet: NFPAChesapeake

Taking it to the Streets and Reading the Building: Side by Side

No comments

Taking it to the Streets and Reading the Building: Side by Side Photo By; CJ Naum

 

Taking it to the Streets and Reading the Building: Side by SideToday’s Street view and Reading the Building opportunity is focused on a large building complex.

At first glance it looks like one BIG building. However, closer scrutiny reveals there are three (3) building occupancies sharing common party walls.

What gives you the first appearance that this may be one building versus three structures?  There are a couple of immediate features that can take you down the wrong path if you’re not familiar with the building type, the inherent features as well as the apparent alterations that are now influencing it.

Reading the Building requires skill sets to keeping looking further beyond what is immediately obvious; that successive layers of observations upon arrival and fluid assessment expose other pertinent, Building, Structure, System, Occupancy and Operational Risks, hazards and Considerations in the development of the incident action plan and determination of strategic, tactical and task objectives and assignments.

Here are our Buildingsonfire Street Questions:

  • Identify the Building Type(s)
  • Can you differentiate the structural system present?
  • How many buildings are there and why?
  • What if inherent with the Building and Features?
  • What is obvious from the Alpha Street Side?
  • There are observable features that will be mission-critical related to Building Performance, can you identify?
  • What is the expected Predictability of Performance of the buildings and occupancy areas?
  • Occupancy Risk is projected to be what?
  • Looking at the alleyway on the Delta Division, what can you identify that would be of importance to the IAP and company operations, both interior and exterior.
  • What is the expected of the Perimeter Walls (PW)?
  • Fire Travel and Propagation: Do you know what to project, anticipate and plan for?
  • Operational risk might be what given moderate fire with extension on an upper floor?
  • Give yourself some added considerations based on either: Engine Co., Truck/Ladder Co., Rescue/Squad Co., Commander (IC) or RIT/FAST role responsibilities;
  • What questions would you seek to identify and answer or assume on the first-due as you read the building?

That’s plenty to keep you going…

Checkout the comments and interactions on Buildingsonfire on Facebook HERE and don’t forget to to LIKE and pass the link along

Here’s a PDF that you can download and share with the company, at the station or use of a quick in-service drill; HERE StreetsSidebySide

Taking it to the Streets: Columbus

No comments
Here’s a new Building to Read. What do think the Structural System and assemblies are compromised of?
  • What does the building envelope look like.
  • What type of structural systems might be present?
  • What would the least favorable system be?
  • Projected occupancy load: Operational concerns for a major floor fire?
  • Fire Extension probability?
  • Occupancy Type?
  • Occupancy Risks?
  • First-Due Company or Command Officer critical operational considerations?
  • Predictability of Building Performance: Lots more here than meets the eye on the first glance….
  • What are the projected operational risks?

    Reading the Building: Taking to the Streets- Risk and Profile? Photo by CJ Naum

 
 
  • Here’s the direct link to this discussion: HERE
We’re expanding our interactive postings on Buildingsonfire on Facebook. If you haven’t checked them out, do so.
Plenty of interactive postings and discussions.
  • Don’t forget to LIKE Buildingsonfire on FaceBook and CommandSafety on Twitter
  • We post frequent interactive sessions on Buildingsonfire on Facebook. 
  • Look for Ten Minutes in the Street returning to TheCompanyOfficer.com in March…..coming soon with new interactive and expanded content

 

 

Near-Miss, with RIT Deployment at Structural Collapse: Canada

No comments

A rapid and fast moving early morning fire in downtown Trenton, Ontario Canada resulted in the subsequent collapse of a three story mixed use commerical and apartment occupancy structure. Published media reports indicated the building was over 130 years of age and was in operation as an adult entertainment establishment on the lower level with multiple occupancy use apartments on the upper floors. The fire displaced 12 residents. The commercial portion of  the building on the number one floor was not operating at the time of the alarm.

For a complete overview of the general fire, refer to the links below for the media links.

Two firefighters were nearly trapped while engaged in primary search and rescue operations as the fire conditions deteriorated and compromise and collapse  conditions began to collapse the wood frame structure.

Pre-incident images clearly depict the typical building profile of a heritage type structure of the late 1880′s vintage with it’s sloping roof profile and window treatments that are evident on both the bravo and delta divisions (many with window mounted air conditioning units that constitute a collapse risk to operating companies on the ground perimeter) . As with many buildings in urban areas, the exterior envelope has been renovated in a manner that added an exterior metal clad panel system that is typically mechanically fastened directly to the facade or to a sub-assembly fastening system. This in effect covers the buildings originating facade, building materials and structural and cosmetic conditions.

Common to original building construction and layouts, the alpha division shows the manner in which the first floor wall has been modified with no indication of window locations and conditions in the upper floors. Common to this renovation technique is the placement of the metal facade directly over existing window openings and framing systems, resulting in either boarded and elimination of the window or the fames and glass still present within the interior room compartments compounding search and rescue assignments.

Sherwood Forest Inn, Image from Google Street View

 The metal exterior cladding masks the ability for arriving companies to identify if the structure is wood frame Type V, ordinary Type III or Brace Frame construction.  The profile and charactoristics of this building profile suggests a buidling of Type III Ordinary construction ( Brick and jost) with load bearing masony construction. This is not the case in this structure as fireground photos further depicted. The various fireground photos suggest that this was a wood frame structure with wood exterior sheathing with some brick masonry features applied to the alpha division. The building envelope is encased in a sheet metal panel cladding system attached the perimeter facade.

 

Delta Division, Google Street View Image

  

Image above shows the degree of interior fire involvement and smoke density. The sheet metal cladding that was applied to the surface facade masks the ability to monitor wall degradation and compromise, retains heat within the building envelope and has independent collapse considerations based upon the manner it is atached to the outer facade further compounding the structural integrity of the buildings wall envelope. Photo by Step Crosier.

In incidents taht have building profiles such as this, conservative risk management, establishment of primary and secondary collapse perimeters along the various divisions is imperative for firefighter safety and apparatus operabilty.

Collapse and failure of the primary structural support systems affecting both interior and exterior structural and infill systems. Photo by Marc Venema

The image above shows the extent of collapse. Look at the various construction features consisting of the original wood plank sheathing, brick facade work, wood framing system and the retrofitted metal paneling facade.  

  • How would you Read the Building based upon the pre incident photos shown at the being of this post?
  • Would you assume the building was a type III or IV structure or a wood frame or brace frame structure?
  • Does each building system have a different bearing on fireground operations, strategies, tactics and operational integrity and company and personnal safety?
  • How much operatoinal time do you have for a primary search and rescue assignment or for deployment and effective location of a fire seat and application of hose streams before you developing compromising conditions with the interior compartments?

 

Look at the brick veneer added to the wood sheathing covered by the metal panels in this image. Photo by Steph Crosier

 

 

 

   

 

Adaptive Fireground Management for Company and Command Officers: FDIC 2012

No comments

 

Here’s a promo for the program; “Adaptive Fireground Management for Company and Command Officers”: that will be presented at the Fire Department Instructors Conference- FDIC on Thursday April 19, 2012 10:30 am in Wabash 2.  If you’re attending FDIC this year, plan to mark this program down as one of your stops. I look forward to meeting “youz guys”.

This class presents new insights into emerging concepts and methodologies related to the challenges that arise while fighting today’s structural fires today. Extreme fire behavior, building construction, and occupancy risk mandate new strategic, tactical, and operational modeling. Students will be introduced to a new integrated model that represents new methodologies for predictive risk management, command compression and resiliency, tactical patience, and five-star command theories. This program has direct relevancy to all operational levels and ranks with specific focus toward company- and command-level responsibilities. INTERMEDIATE

Adaptive Fireground Management-FDIC 2012

 I’ll be posting some of my picks for must see FDIC programs later along wth some highlights of other programs that should be on your radar screen.

Dont Forget:

  • Buildingsonfire Channel on Youtube (subscribe): HERE
  • Buildingsonfire: Facebook HERE

FDIC Where Leaders Come to Train

The Worcester 6

No comments

On December 3, 1999, a five-alarm fire at the Worcester Cold Storage & Warehouse Co. building claimed the lives of six brave firefighters who responded to the call. These six heros, The Worcester 6, sacrificed their lives to try and rescue two individuals who were believed to be trapped inside the inferno. May the Worcester 6 always be remembered; “Fallen Heroes Never Forgotten.”

Firefighter Paul A. Brotherton
Firefighter
Paul A. Brotherton
Firefighter Timothy P. Jackson
Firefighter
Timothy P. Jackson
Firefighter Jeremiah M. Lucey
Firefighter
Jeremiah M. Lucey
Firefighter James F. Lyons
Firefighter
James F. Lyons
Firefighter Joseph T. McGuirk
Firefighter
Joseph T. McGuirk
Lieutenant Thomas E. Spencer
Lieutenant
Thomas E. Spencer

 

Mission Critical Reports, Links and Reading for the Company and Command Officer:

The Perfect Fire

It started with a candle in an abandoned warehouse. It ended with temperatures above 3,000 degrees and the men of the Worcester Fire De- partment in a fight for their lives.

Read more: http://www.esquire.com/features/perfect-fire-0700#ixzz1fUAOvMsZ

 

Apartment Complex Under Construction: Rapid Deployment and Operations

No comments

Rapid Fire Extension is Evident due to the Unprotected/Exposed Framing

A three-story apartment building that was under construction caught fire late this past week durinfgthe early evening in Carson, California (LA County).  The fast moving fire rapidly extended through an apartment building complex under construction and spread to a nearby mobile home park damaging at least 10 homes and forcing evacuations, according to published reports. There were no reports of injuries.

The flames engulfing the building site at 21828 South Avalon Boulevard turned the working construction site into a 3-alarm fire shortly after 17:00 hours.

Over 100 firefighters from 40 companies responded and worked the greater alarm fire, with rapid and effective fire control attained in short order in the early evening hours.

Construction sites, especially those with exposed phased wood framing pose significant operational challenges and demands.

First arriving response companies and command must quickly determine the size and magnitude of any rapidly advancing fire and efficiency determine an aggressive action plan that must be deployed rapidly while immediately considering the need for additional resources.

Normally, offensive strategic and tactical measures are highly ineffective due to the need to place operating companies in advance positions that may have high risk parameters subjecting companies to unacceptable safety risks.

The need for rapid and highly mobile hose line placement that must be sized appropriately with flow and delivery for the fire magnitude precludes hand line placement and results in the need to place portable monitors, deck monitors and elevated master streams into operation.

Safety and accountability are high priorities at multiple alarm incidents involving a construction site.

Aerial View of the Primary Fire Complex and Mobile Home Park Exposures to the right of the image

The blaze was rapidly progressing out of control when the first fire units arrived about three minutes after the incident was reported, officials said. The first-in company requested additional alarms due to the fast movement of the fire and its intensity.

The three-story structure had more than 100 units and was being framed.  This open framing phase of construction is highly susceptible to fire exposure and ripid development and extension. The large volume of wood, coupled with the open spaces, allowed wind to blow through the structure and stoke the blaze, officials said. That radiated heat combined with wind gusts sent the fire into a nearby mobile home park. More than 139 mobile homes were evacuated. At least 10 homes in the park were damaged by flames.

The entire 139-unit mobile home park was evacuated after the fire and residents were not be allowed to return overnight. The other two senior living buildings on the property were also evacuated, but residents were being allowed back in late into the evening.

The total damage estimate was $3.1 million, with $2.5 million for the senior living center and $600,000 for the mobile home park.Investigators have ruled out arson in a fire that burned through part of a multi-story residential complex under construction in Carson, according to later reports.
The Los Angeles County Fire Department and the sheriff’s arson and explosives detail determined that the fire was accidental, although an exact cause will not be available, probably for several weeks, per the sheriff’s headquarters bureau.

 

The construction site which was part of a planned 150-unit luxury apartment building was set to open July 2012.

Rendering of the Complex

 

Related Photos

Firefighing operations at the Carson apartment building View all 30 photos

The cause of the fire was under investigations. See photos of firefighters battling the blaze in Carson.

  • The Los Angeles Times, Reports HERE.
  • KABC-TV has additional video and details HERE.
  • Fireground photo gallery HERE.

 

Fire Engulfs Carson Construction Site: MyFoxLA.com

 

Some Highlighted Operational Considerations (not inclusive)

  • Pre-Fire Plan Large Construction Projects
  • Understand the various Phases to a Construction Project and site and how they affect fire operations at the various stages; there is a difference
  • Identify and train for non-conventional Strategic and Tactical operational actions
  • Ensure predetermined multiple alarm resources are identified and greater alarms are established
  • Train your Company and Command Officers to identify correct IAPs and Manage Construction site fires
  • Maintain an appropriate risk profile balance with operational needs; with personnel safety being foremost
  • Clearly establish multiple Safety Offices and establish geographical resources within the incident management system for reconnaissance, communications, oversight and focused safety monitoring
  • Know you water supply and system capabilities and limitations
  • Determine fire flow needs based upon construction phases, as these change over time as the building goes up. Match fire flow demands with resource availability (time of day gaps etc.)
  • Identify exposures (Physical structures and Civilians) and ensure they are calculated into the incident action plan at the right time, before they become immediate identified needs or concerns
  • Companies shall maintain a conservative safety posture; this is not the time for overly aggressive firefighting- it is the time for smart firefighting that can be highly efficient with appropriate tactics and company officer supervision
  • Always consider collapse zones: partial or complete. Stay out of them! Be aware of your surroundings and maintain situational awareness
  • Respect the wind; it’s not going to help you
  • Consider current and projected weather conditions in your operational and tactical plans and assignments; plan ahead
  • Did I already say: Pre-fire Planning?
  • Be calculated in the placement of your apparatus, especially in larger scale incidents that are defined under greater geographical divisions; Think ahead
  • The fire usually consumes the available fuel load rapidly; going from a Huge fire, to one that is sometimes much more manageable; watch and control your exposures and degree of fire extension. Don’t help to make the fire even bigger through ineffective and dysfunctional command and control
  • Anticipate, Project, Plan and Engage
  • Respect the Fire: it’s not going to play by the regular rules of combat fire suppression and engagment as you would expect to find in finished and enclosed structures and buildings.

 

How prepared are you to address a rapidly developing fire in a building or construction site; as the first-due Company Officer or as the Commanding Officer?

Is your company, battalion or department capably trained and skilled to address this type of demanding incident operation?

Do you have any training or operational gaps?

Do you have any construction sites working in your first-due or greater alarm or mutual aid areas?  If so, then – Maybe you need to do any pre-fire planning…..?

Tactical Operations and Combat Fire Engagement with Go >Forward Training

No comments

 

Predictability of Performance and The NROE

 
Are you making plans to attend the newest premiere training conference, offering the latests in integrated eMedia, interactive classroom and hands-on training, education and networking? The Buildingsonfire.com family ( consistings of CommandSafety.com, TheCompanyOfficer.com, Taking it to the Streets Radio and Buildingsonfire.com) will be presenting two cutting edge and timely programs at both the Gateway Midwest Fire and leadership Training Conference on   

October 21 – 23, 2011 | St. Charles, MO  and the
November 4 – 6, 2011 | King of Prussia, PA

 

Dynamic Programs, Leading Instructors, Interactive, Dynanic and Social

 

Tactical Ops and the New Rules of Combat Fire Engagement

This session will present the new rules of combat structural fire engagement and provide insights into integrated command and operational risk management, tactical safety and tactical protocols based on occupancy risks versus occupancy type. Building and occupancy profiling requires knowledge of emerging construction methods, features, systems and components. Coupled with the increasing commonality of extreme fire behavior and the increased fire load package, these factors require new skill sets in reading the building and implementing predictive occupancy profiling to determine appropriate tactics for firefighters, company and command officers.

The class will examine case studies, history-repeating events, the latest testing and research findings on vent path theory, fire behavior, structural system integrity, wind driven fire theory and fire suppression theory, and engage students through interactive exercises and group discussions.

 

Reading the Building: Predictive Occupancy Profiling

Presented by Christopher J. Naum
Chief of Training, Command Institute, DC

And John Shafer
Lieutenant and Training Officer, Greencastle (IN) Fire Department

Today’s buildings and occupancies continue to present unique challenges to command and operating companies during combat structural fire engagement. Building and occupancy profiling, identifying occupancy risk versus occupancy type, emerging construction methods, features, systems and components coupled with the increasing commonality of extreme fire behavior and the increased fire load package require new skill sets in reading the building and implementing predictive occupancy profiling for firefighters, company and command officers. Integral to the presentation will be detailed discussions on building and structural system placarding methods and labeling programs.

 

Hands-On Training, Leadership/Strategy Workshops, Inspiring Education & Networking in the Midwest

Hands-On Training, Leadership/Strategy Workshops, Inspiring Education & Networking in the Midwest

October 21 – 23, 2011 | St. Charles, MO

Three packed days of top-notch education on leadership, strategy/tactics & professional growth with big name and fresh faces, multiple hands-on training by Brotherhood Instructors, pre-conference workshops featuring Tim Sendelbach & Rich Gasaway, social & networking events, inspiring keynotes, open discussions and more.

 

Hands-On Training, Leadership/Strategy Workshops, Inspiring Education & Networking in the East

Hands-On Training, Leadership/Strategy Workshops, Inspiring Education & Networking in the East

November 4 – 6, 2011 | King of Prussia, PA

Three packed days of top-notch education on leadership, strategy/tactics & professional growth with big name and fresh faces, multiple hands-on training by Brotherhood Instructors, pre-conference workshops featuring Alan Brunacini, Dennis Rubin & Rich Gasaway, social & networking events, inspiring keynotes, open discussions and more.

 
 
 Check out the podcast program on the New Fire Ground on Taking it to the Streets
 
 
 Take a run over to FirefighterNetcast.com and Taking it to the Streets and download the recent program that provided and insightful look and discussion of the New Fire Groundand the issues affecting the First-Due Officer and Command…which was hosted by our own Christopher Naum and two nationally renowned and highly regarded fire officers, instructors and innovators.Both Divison Chief Ed Hadfield (CA) and Deputy Chief Jason Hoevelmann (MO) are speakers at the Gateway Midwest Fire & Leadership Training Conference brought to you by Go Forward Training and coming to the St. Charles/St.Louis, Missouri metro area on October 21-23. 2011.

  • Conference Direct Link HERE.
  • Go Forward Training HERE
 
Taking it to the StreetsTM is a monthly radio show featured on BlogTalk Radio and is hosted by nationally renowned fire service leader Christopher Naum, a 36-year fire service veteran and highly regarded national instructor, author, lecturer and fire officer and the distinguished leading national authority on building construction and fire ground operations. Taking it to the StreetsTM is a Buildingsonfire.com Series and FireFighternetcast.com Production, © 2011 All Rights ReservedCheck out the latest downloads of recent programs in the archives by visiting Taking it to the Street’s webpage on Firefighternetcast.com or for program insights at CommandSafety.com.

  • Tune in to the Program Wednesday evening August 17th at 9:00 pm ET, HERE
  • Firefighternetcast.com HERE
  • Taking it to the Streets Radio Programs, HERE and HERE
  • Buildingsonfire.com, HERE

Tonight on Taking it to the Streets: The New Fire Ground and the First-Due

No comments

Tonight on Firefighternetcast.com; Taking it to the Streets-The New Fire Ground and the First-Due

The New Fire Ground and the First-Due

Join in tonight at 9pm ET for another special and exciting program continuing our series discussion on the Emerging Tactical Renaissance in the Fire Service.

Taking it to the StreetsTM, radio program hosted by highly regarded national instructor, author, lecturer and fire officer Christopher Naum, continues to provide provocative insights and dynamic discussions with leading national fire service leaders and guests on important issues affecting the American Fire Service with applications internationally within the tradition and brotherhood of the Fire Service.
This edition of Taking it to the StreetsTM the program will be looking at the New Fire Ground and the First-Due
Joining the program will be two special guests: Division Chief Ed Hadfield (CA) and Deputy Chief Jason Hoevelmann (MO) providing a great opportunity to listen to perspectives from coast to coast and the heartland.

Join in on what is certainly going to be an insightful look and discussion of the New Fire Ground and the issues affecting the First-Due Officer and Command…

Both Divison Chief Ed Hadfield (CA) and Deputy Chief Jason Hoevelmann (MO) are speakers at the Gateway Midwest Fire & Leadership Training Conference brought to you by Go Forward Training and coming to the St. Charles/St.Louis, Missouri metro area on October 21-23. 2011. I also have the honor of lecturing and presenting two programs, one of which one will be co-presented with my good friend and colleague Lt. John Shafer. (The GreenMaltese.com HERE)

  • Conference Direct Link HERE.
  • Go Forward Training HERE

Incorporating and facilitating the latest training delivery concepts and methodologies and integrating current and emerging technology, social media platforms, eMedia and internet based content management material in order to provide unparalleled fire service curricula, training and education, The Command Institute, Buildingsonfire.com and Fire Fighternetcast.com will be integrating content across a number of platforms to provide you with supportive information and training that will ultimately integrate with the direct training deliveries at the conference.

This segment of Taking it to the Streets on FirefighterNetcast.com is the first step in achieving that goal and process. Look for more integrated materials, exercises and eMedia on CommandSafety.com, TheCompanyOfficer.com and Buildingsonfire.com

Grab a cup of coffee and sit down for a special one hour program with Taking it to the Streets on FirefighterNetcast.com where we’ll be discussing developing concepts, methodologies and operational perspectives affecting today’s emerging and evolving fire ground and the new considerations for the First-Due with Christopher Naum and fire service leaders, Division Chief Ed Hadfield and Deputy Chief Jason Hoevelmann.

Join in on the live open discussion with other fire service personnel from around the country.

Taking it to the StreetsTM is a monthly radio show featured on BlogTalk Radio and is hosted by nationally renowned fire service leader Christopher Naum, a 36-year fire service veteran and highly regarded national instructor, author, lecturer and fire officer and the distinguished leading national authority on building construction and fire ground operations. Taking it to the StreetsTM is a Buildingsonfire.com Series and FireFighternetcast.com Production, © 2011 All Rights Reserved

Check out the latest downloads of recent programs in the archives by visiting Taking it to the Street’s webpage on Firefighternetcast.com or for program insights at CommandSafety.com.

  • Tune in to the Program Wednesday evening August 17th at 9:00 pm ET, HERE
  • Firefighternetcast.com HERE
  • Taking it to the Streets Radio Programs, HERE and HERE
  • Buildingsonfire.com, HERE

Gateway Midwest Fire & Leadership Training Conference

Gateway Midwest

Gateway Midwest

October 21 – 23, 2011 | St. Charles, Missouri
Join Us at Our Inaugural Event!
Featuring three packed days of hands-on training, top notch education with big names and fresh faces, pre-conference workshops, social events, open discussions and more.

Liberty Regional

Liberty Regional

November 4-6, 2011 | King of Prussia, PA
Three days of top notch hands-on training, a comprehensive educational program featuring top names and fresh faces, pre-conference workshops, social events, open discussions and more.

JEMS Seminar Series

JEMS Seminar Series

October 21-23, 2011 | St. Charles, Missouri
Bringing the Best in EMS Education to Your Region
We know budgets are tight, we know it can be tough to get approval to attend a conference out of state. The JEMS Seminar Series brings high-quality, high-impact EMS speakers right to you.
Learn, Network, Share & Save!

Building Knowledge=Fire Fighter Safety

No comments

What is YOUR level of Knowledge?

Modern incident demands on the fireground are unlike those of the recent past requiring incident commanders and commanding officers to have increased technical knowledge of building construction with a heightened sensitivity to fire behavior, a focus on operational structural stability and considerations related to occupancy risk versus the occupancy type.  

Strategies and tactics must be based on occupancy risk, not occupancy type, and must have the combined adequacy of sufficient staffing, fire flow and tactical patience orchestrated in a manner that identifies with the fire profiling, predictability of the occupancy profile and accounts for presumptive fire behavior.  

Building Knowledge = Fire Fighter Safety….where do you fit into this equation?

Christopher Naum, SFPE, 2011

 

Know Your World

 

SFFD Firefighter Memorials and Updates

No comments

More details emerged Monday about last week’s fatal Diamond Heights blaze, as fire officials said an emergency alert accidentally went off on a nearby fire engine about the same time two firefighters’ personal alarms sounded inside the burning building according to published reports.

Lt. Vincent Perez, 48, and firefighter-paramedic Anthony Valerio, 53, of Engine Company 26 both died from injuries they suffered while battling a blaze at a four-story home at 133 Berkeley Way on Thursday morning.

While fighting the fire, one or both of Valerio and Perez’s personal alert safety system devices went off.  Around the same time, a firefighter on Engine Company 20 — which had yet to arrive on the scene — had inadvertently hit the emergency button on the engine.

Firefighter memorials

A joint funeral for fire Lt. Vincent Perez and firefighter-paramedic Anthony Valerio will be held at 12:30 p.m. Friday at St. Mary’s Cathedral, 1111 Gough St. in San Francisco. A vigil for the two men will be held at 7 p.m. Thursday, also at St. Mary’s.

San Francisco Fire Fighters Local 798 has established trust accounts at the San Francisco Fire Credit Union for the families of Perez and Valerio. Donations can be made to SFFCU, 3201 California St., San Francisco, CA 94118.

Condolence messages can be sent to Fire Station 26, 80 Digby St., San Francisco, CA 94131.

Combat Ready and the Fire Service Warrior on Taking it to the Streets

No comments

Taking it to the Streets with Christopher Naum

Join in on Tuesday May 17th at 9pm ET for another special and exciting program continuing our series discussion on the Emerging Tactical Renaissance in the Fire Service.

Taking it to the StreetsTM, radio program hosted by highly regarded national instructor, author, lecturer and fire officer Christopher Naum, continues to provide provocative insights and dynamic discussions with leading national fire service leaders and guests on important issues affecting the American Fire Service with applications internationally within the tradition and brotherhood of the Fire Service.
This edition of Taking it to the StreetsTM the program is all about being COMBAT READY and THE FIRE SERVICE WARRIOR
Joining the program will be special guest, Christopher Brennan the author of The Combat Position: Achieving Firefighter Readiness, published by PennWell Books and the author of the notable blogsite, The Fire Service Warrior.

Christopher Brennan

Christopher Brennan is a firefighter in the suburbs outside Chicago; a field instructor for the Illinois Fire Service Institute; and a consultant for local, state, and federal agencies.

He joined the fire service in 1997 as a paid-on-call member of the Calumet Park (IL) Fire Department.

During his career, Chris has worked for the Calumet Park Fire Department, part-time for the Darien-Woodridge (IL) Fire Protection District, and as a career firefighter and engineer with the Harvey (IL) Fire Department.Chris is an active instructor teaching for the Illinois Fire Service Institute, has taught terrorism response training overseas, and has been an instructor for FDIC.

He is a member of the International Association of Fire Fighters, the International Society of Fire Service Instructors, and the Illinois Society of Fire Service Instructors.

He is also the author of numerous articles for fire service magazines, including Fire Engineering.

Join in on what is certainly going to be an insightful look and discussion of the path of the fire service warrior.

Discussions on what is meant by embracing the philosophy of the fire service warrior, and striving for the ready position—the synthesis of physical and mental readiness that allows for suggested optimum fireground performance— and its potential application towards reducing firefighter injuries and fatalities

We’ll further explore how as Christopher Brennan states; “Today’s firefighter must be a warrior who will unflinchingly put his very life in harm’s way to accomplish a mission, but who is also fully informed about the path being chosen”.

LINKS

  • Surviving on the Fireground: Chris Brennan Talks Situational Awareness at FDIC 2011, HERE
  • A Culture of Excellence – Christopher Brennan , HERE
  • The Fire Service Warrior Blog, HERE

The Combat Position

The Combat Position: Achieving Firefighter Readiness, PennWell Books, HERE

Firefighting is combat and should be viewed as a warrior’s calling.

Firefighters put themselves in harm’s way to protect others, a selflessness rooted in the same noble drive as the military warriors who defend our nation.

This book about combat is meant to be a guide for those who seek to follow a warrior’s path, the path of the fire service warrior.

Today’s firefighter must be a warrior who will unflinchingly put his very life in harm’s way to accomplish a mission, but who is also fully informed about the path being chosen.

Embracing the philosophy of the fire service warrior, and striving for the ready position—the synthesis of physical and mental readiness that allows for optimum fireground performance—can reduce firefighter injuries and fatalities.

The Combat Position: Achieving Firefighter Readiness will be an invaluable tool for firefighters, company officers, chief officers, and instructors.

 

Grab a cup of coffee and sit down for a special one hour program with Taking it to the Streets on FirefighterNetcast.com where we’ll be discussing developing concepts, methodologies and operational perspectives affecting today’s emerging and evolving fire ground operation with Christopher Naum and this emerging fire service leader.

Join in on the live open discussion with other fire service personnel from around the country.

Taking it to the StreetsTM is a monthly radio show featured on BlogTalk Radio and is hosted by nationally renowned fire service leader Christopher Naum, a 36-year fire service veteran and highly regarded national instructor, author, lecturer and fire officer and the distinguished leading national authority on building construction and fire ground operations. Taking it to the StreetsTM is a Buildingsonfire.com Series and FireFighternetcast.com Production, © 2011 All Rights Reserved

Check out the latest downloads of recent programs in the archives by visiting Taking it to the Street’s webpage on Firefighternetcast.com or for program insights at CommandSafety.com.

  • Tune in to the Program Tuesday evening May 17th at 9:00 pm ET, HERE
  • Firefighternetcast.com HERE
  • Taking it to the Streets Radio Programs, HERE and HERE
  • Buildingsonfire.com, HERE

Surviving the Fire Ground – Fire Fighter, Fire Officer and Command Preparedness 2011

No comments
Safety Week 2011

The International Association of Fire Chiefs (IAFC) and the International Association of Fire Fighters (IAFF) are pleased to announce the 2011 Fire/EMS Safety, Health and Survival Week (also known as Safety Week) to be held the week of June 19-25, 2011.

The message this year is: Surviving the Fire Ground – Fire Fighter, Fire Officer and Command Preparedness

Safety, Health and Survival Week (Safety Week) is a collaborative program sponsored by the IAFC and the IAFF, coordinated by the IAFC’s Safety, Health and Survival Section and the IAFF’s Division of Occupational Health, Safety and Medicine, in partnership with more than 20 national fire and emergency service organizations.

Fire departments are encouraged to suspend all non-emergency activity during Safety Week and instead focus entirely on survival training and education until all shifts and personnel have taken part. An entire week is provided to ensure each shift and duty crew can spend one day focusing on these critical issues.

With so many changes (budget cuts, staffing reductions, reduced training, etc.) in so many fire departments, it is critical for fire fighters to focus on their own survival on the fire ground. There is no other call more challenging to fire ground operations than a MAYDAY call — the unthinkable moment when a fire fighter’s personal safety is in imminent danger.

Fire fighter fatality data compiled by the United States Fire Administration have shown that fire fighters “becoming trapped and disoriented represent the largest portion of structural fire ground fatalities.” The incidents in which fire fighters have lost their lives, or lived to tell about it, have a consistent theme — inadequate situational awareness put them at risk.

Fire fighters don’t plan to be lost, disoriented, injured or trapped during a structure fire or emergency incident. But fires are unpredictable and volatile, and an unpredictable fire ground can cause even the most seasoned fire fighter to be overwhelmed in an instant.

This year’s Safety Week will focus on delivering the online IAFF Fire Ground Survival (FGS) awareness training course to all fire departments. The program is the most comprehensive survival skills and MAYDAY prevention program currently available and is open to all members of the fire service. Additional planning tools and resources will be available on the Safety Week website.

The IAFF Fire Ground Survival Program (FGS) is the most comprehensive survival-skills and mayday-prevention program currently available and is open to all members of the fire service. Incorporating federal regulations, proven incident-management best practices and survival techniques from leaders in the field, and real case studies from experienced fire fighters, FGS aims to educate all fire fighters to be prepared if the unfortunate happens.

For links to the IAFF Fire Ground Survival Program, HERE and HERE

The program will provide participating fire departments with the skills they need to improve situational awareness and prevent a mayday. Topics covered include:

  • Preventing the Mayday: situational awareness, planning, size up, air management, fitness for survival, defensive operations.
  • Being Ready for the Mayday: personal safety equipment, communications, accountability systems.
  • Self-Survival Procedures: avoiding panic, mnemonic learning aid “GRAB LIVES”— actions a fire fighter must take to improve survivability, emergency breathing.
  • Self-Survival Skills: SCBA familiarization, emergency procedures, disentanglement, upper floor escape techniques.
  • Fire Fighter Expectations of Command: command-level mayday training, pre-mayday, mayday and rescue, post-rescue, expanding the incident-command system, communications.

Keep watching the website and the IAFC’s Facebook, Twitter and LinkedIn pages for continuing updates to this year’s program and planning resources.

Remember to visit the SHS Section’s website for more information on health and safety issues and the IAFF’s Health, Safety and Medicine’s website for more information on health, wellness and safety programs.

Additionally, look for a comprehensive series of articles, activities, insights, downloads, podcasts, video clips and resources that will be posted each day of Safety, Health and Survival Week here on Commandsafety.com, Thecompanyofficer.com and Buildingsonfire.com.

Announcements and campaign materials will begin posting in Mid-May.

We will be offering a special series of live shows nightly on Taking it to the Streets on Firefighternetcast.com and blogtalkradio during the week of June 19-25, 2011 addressing key issues with a stellar line-up of fire service leaders.

This will be an exceptional opportunity to listen in, call in and participate actively in the week’ theme of Surviving the Fire Ground – Fire Fighter, Fire Officer and Command Preparedness.

These shows will be mission critical. Stay Tuned for more upcoming information.

 

 

Start making your plans for Safety, Health and Survival Week 2011…..

The Consciences Observer or Activist
The operative question going forward will be this: What will you personally commit to for Safety, Health and Survival week, or your department chose to do; participate in, contribute, join in, share, lead, promote, instruct, present, facilitate, help, assist, aid, or neglect, disregard, undermine, abuse, challenge, demoralize, undercut, damage, torpedo, circumvent, or avoid?

Survivability Profiling: Taking it to the Streets

No comments

Live Online April 20th at 9pm ET

Live and Online Taking it to the Streets with your host Christopher Naum will present another timely and insightful look at an emerging element of today’s evolving fire ground.
 
 
Join in on Wednesday April 20th at 9pm ET for a very special and exciting program discussing the concepts and theory of Survivability Profiling.
 
Joing the program will be special guest, Captain Stephen Marsar, FDNY assigned to Engine Co. 8 in the Third Division, Manhattan, NYC.
Captain Marsar, FDNY has researched and developed insights into the theory and application of Survivability Profiling.
The Department of Homeland Security’s U.S. Fire Administration announced on April 4 that Capt. Stephen Marsar, Engine 8, is one of three fire service executives from across the country who was selected to receive the National Fire Academy’s 2010 Annual Outstanding Research Award.

The award recognizes Executive Fire Officer Program students for exceptional research projects.

Capt. Marsar’s project, titled Can They Be Saved? Utilizing Civilian Survivability Profiling to Enhance Size-Up and Reduce Firefighter Fatalities in the Fire Department, City of New York, was selected as the Executive Leadership Course award winner. The National Fire Academy said it was chosen from among the more than 60 Applied Research Projects submitted this year, the highest number in the program’s 26-year history.

The Executive Fire Officer Program provides senior fire officers with information and education on various facets of fire administration. After a four-year course of study, participants are required to complete an applied research project that attempts to resolve a problem in their own organization.

View Capt. Marsar’s project: http://www.usfa.dhs.gov/pdf/efop/efo44310.pdf

Grab a cup of coffee and sit down for a special one hour program with Taking it to the Streets on FirefighterNetcast.com where we’ll be discussing the concept, research and application of Survivability Profiling with Captain Marsar and the manner in which it might be implemented in today’s emerging and evolving fire ground operational methodologies with Christopher Naum and this outstanding fire service leader.

Capt. Stephen Marsar, FDNY

STEPHEN MARSAR is a captain in the Fire Department of New York, covering in Engine Company 8 in Manhattan. He has previously served in Engine Company 16 and Ladder Companies 7 and 11. An ex-commissioner in the Bellmore (NY) Fire Department, he has certifications as a national and New York State fire instructor, NY instructor coordinator, and NY State Department of Health regional faculty member.

He serves on the adjunct faculty for the Nassau Community College, NY Fire Science Degree Program, and teaches for the FDNY and Nassau County, Long Island, Fire and EMS academies. He has a bachelor’s degree in fire science and emergency services administration and is enrolled in the Executive Fire Officer Program at the National Fire Academy.

Taking it to the StreetsTM is a monthly radio show featured on BlogTalk Radio and is hosted by Christopher Naum and is a Buildingsonfire.com Series and FireFighternetcast.com Production, © 2011 All Rights Reserved

Join in on the live open discussion with other fire service personnel from around the country. Check out the latest downloads of recent programs in the archives by visiting Taking it to the Street’s webpage on Firefighternetcast.com or for program insights at CommandSafety.com.

  • Tune in to the Program Wednesday evening April 20th at 9:00 pm ET, HERE
  • Firefighternetcast.com HERE
  • Taking it to the Streets Radio Programs, HERE and HERE

Near Miss Reporting and One Captain’s Close Call

1 comment

Taking it to the Streets: Near Miss Reporting and One Captain’s Close Call

On Your Street, In Your City, Across the Country, Around the WorldTM

 
 
 Join us on Wednesday night March 16th at 9:00 pm ET for an insightful discussion on the National Near-Miss reporting System with a stellar line-up of fire service leaders.

The line-up of Scheduled guests includes,

  • Lt. Steve Mormino, FDNY (ret),
  • Captain CJ Haberkorn Denver (CO) Fire Department and
  • Special Guest Captain Michael Long, Camp Taylor (KY) Fire Protection District.

 Grab a cup of coffee and sit down for a special two part, two hour program with Taking it to the Streets on Firefighernetcast.com where we’ll be discussing the National Near-Miss Reporting System and the untapped resources that the program and system provides with Christopher Naum and this outstanding group of fire service leaders.

The second part of the program will dedicated to the personal account of Captain Long’s Close Call event from July 25, 2010 (NMR #10-1072) when a catastrophic floor collapse at a residential occupancy plunged him into a fire involved basement.

 

Join in on the live open discussion with other fire service personnel from around the country. Check out the latest downloads of recent programs in the archives by visiting Taking it to the Street’s webpage on Firefighternetcast.com or for program insights at CommandSafety.com.

  • Tune in to the Program Wednesday evening March 16th at 9:00 pm ET, HERE
  • Firefighternetcast.com HERE
  • Taking it to the Streets Radio Programs, HERE and HERE
  • National Near Miss Reporting System, HERE
  • National Near Miss Reporting System Resources, HERE
  • National Near Miss Reporting System, 2011 Calendar and Annual Report, HERE
  • One Captain’s Personal Near Miss Event, HERE
  • Incident Posting from Commandsafety.com from 2010, HERE

Taking it to the StreetsTM is a monthly radio show featured on BlogTalk Radio and is hosted by Christopher Naum and is a Buildingsonfire.com Series and FireFighternetcast.com Production,

© 2011 All Rights Reserved

 

Ten Minutes in the Street Scenario: On-scene, with Engine Company 13…..

No comments

Ten Minutes in the Street

Ten Minutes in the Street: On-scene, with Engine Company 13…..

Take this scenario and download the details or project the post on a screen and work through the incident and parameters with your company of command officers. Take ten minutes and discuss the operational issue and factors at the Kitchen Table at the firehouse or in the dayroom between calls. Make it a training opportunity today.

Ten Minutes in the Street: On-scene, with Engine 13….You’re dispatched to a commercial building address in your first-due area along with the Truck Company for a report of smoke coming from the building. As you (Engine 13) and Truck 2 respond, another alarm goes out for a reported structure fire with civilians in distress….( take a look at the concurrent Ten in the Street Scenario-Second Alarm that we’re posting along with this scenario HERE). Since you didn’t have enough to do…. Your box alarm assignment is just one and one (Engine and Truck) with a staffing level of five personnel on each company (yah, I know…it’s a real good day on staffing today).

You arrive and are on-scene with Engine 13 and find “some” smoke issuing from the Bravo side (office) and from the Delta side. Both sides have access limitations due to secure fencing.

The building is a commercial building, approximately 100 feet wide x 140 feet deep.

It appears to be a single story; however you can see the grade slope downward on the Bravo Side to the rear: looks like another level in the rear. The Delta side also has a secured fence that separates a vacant exposure structure, which appears to be a vacant convenience store.

Smoke is getting more pronounced..you might say, heavy smoke showin’ at this point.

You’ve got command in the absence.. of a commanding officer. A chief’s enroute, but due to the other alarm, is going to be delayed (either a greater alarm Battalion Chief, or a mutual aide chief is coming). You have additional resources you can call for.

  • Here’s what you have:

  • 100’ x 140’ Unoccupied (Appearing) Building, 14, 000 SF. Circa 1940’s built Type II construction.
  • Masonry perimeter walls, appears to be a heavy wood timber gable truss roof…
  • Security Fencing on both Bravo and Delta sides
  • Apparent vacant exposure structure on the Delta side.
  • Appears to have multiple levels due to grade change on the Bravo side
  • Heavy smoke showing…
  • Forcible entry will be required to gain access
  • You have other resources available, But they are not enroute
  • Hey what about the 360? …what’s up with the Charlie side….?
  • You have another alarm that was dispatched while you were enroute, that sounds like a job with possible civilians’ in distress… so a number of other companies are being dispatched to that call
  • You’re the officer of Engine 13, On-scene with some showing, assuming command….
  • What are you going to do?
  • We’re looking for the usual…IAP, resources, safety, strategy, tactics, limiting factors, risk, operations, construction or occupancy hazards…..


Check out the Ten Minutes in the Street: Second Alarm scenario HERE, it’s the other incident that’s happening across town that we mentioned above, while you were enroute to this alarm….

One Meridian Plaza High Rise Fire: Twenty Years Ago

1 comment
Fire Operations One Meridian Plaza

On what began as an uneventful Saturday night twenty years ago, a fire on the 22nd floor of the 38-story Meridian Bank Building, also known as One Meridian Plaza, was reported to the Philadelphia Fire Department on February 23, 1991 at approximately 2040 hours and went on to burned for more than 19 hours. 

The fire caused three firefighter fatalities (LODD) and injuries to 24 firefighters. 

PFD Line of Duty Deaths: 

  • Captain David P. Holcombe, age 52
  • Firefighter Phyllis McAllister, age 43
  • Firefighter James A. Chappell, age 29
  •  
  • The 12-alarms brought 51 engine companies, 15 ladder companies, 11 specialized units, and over 300 firefighters to the scene.
  • It was one of the largest high-rise office building fire in modern American history –completely consuming eight floors of the building –and was controlled only when it reached a floor that was protected by automatic sprinklers.
  • The Fire Department arrived to find a well-developed fire on the 22nd floor, with fire dropping down to the 21st floor through a set of convenience stairs.
  • Heavy smoke had already entered the stairways and the floors immediately above the 22nd.
  • Fire attack was hampered by a complete failure of the building’s electrical system and by inadequate water pressure, caused in part by improperly set pressure reducing valves on standpipe hose outlets.

The USFA published a technical report (USFA-TR-049) on the One Meridian Plaza fire that is still available for download from the USFA web site, HERE. The report clearly defined the need in 1991, for built-in fire protection systems and reiterated the fact that fire departments alone cannot expect or be expected to provide the level of fire protection that modem high-rises demand. That fire protection must be built-in to the structures. This was clearly illustrated in this event when the One Meridian Plaza fire was finally stopped when it reached a floor where automatic sprinklers had been installed.One Meridian Plaza was a 38-story high-rise office building, located in the heart of downtown Philadelphia, in an area of high-rise and mid-rise structures. The building had three underground levels, 36 above ground occupiable floors, two mechanical floors (12 and 38), and two rooftop helipads. The building was rectangular in shape, approximately 243 feet in length by 92 feet in width (approximately 22,400 gross square feet), with roughly 17,000 net usable square feet per floor. Site work for construction began in 1968, and the building was completed and approved for occupancy in 1973. 

Construction was classified by the Philadelphia Department of Licenses and Inspections as equivalent to BOCA Type 1B construction which requires 3-hour fire rated building columns, 2-hour fire rated horizontal beams and floor/ ceiling systems, and l-hour fire rated corridors and tenant separations. Shafts, including stairways, are required to be 2-hour fire rated construction, and roofs must have l-hour fire rated assemblies. 

The building frame was structural steel with concrete floors poured over metal decks. All structural steel and floor assemblies were protected with spray-on fireproofing material. The exterior of the building was covered by granite curtain wall panels with glass windows attached to the perimeter floor girders and spandrels. The building utilized a central core design, although one side of the core is adjacent to the south exterior wall. The core area was approximately 38 feet wide by 124 feet long and contained two stairways, four banks of elevators, two HVAC supply duct shafts, bathroom utility chases, and telephone and electrical risers. 

SUMMARY OF KEY ISSUES 

  • Origin and Cause: The fire started in a vacant 22nd floor office in a pile of linseed oil-soaked rags left by a contractor. Fire Alarm System The activation of a smoke detector on the 22nd floor was the first notice of a possible fire. Due to incomplete detector coverage, the fire was already well advanced before the detector was activated.
  • Building Staff Response: Building employees did not call the fire department when the alarm was activated. An employee investigating the alarm was trapped when the elevator opened on the fire floor and was rescued when personnel on the ground level activated the manual recall. The Fire Department was not called until the employee had been rescued.
  • Alarm Monitoring Service: The private service which monitors the fire alarm system did not call the Fire Department when the alarm was first activated. A call was made to the building to verify that they were aware of the alarm. The building personnel were already checking the alarm at that time.
  • Electrical Systems: Installation of the primary and secondary electrical power risers in a common unprotected enclosure resulted in a complete power failure when the fire-damaged conductors shorted to ground. The natural gas powered emergency generator also failed.
  • Fire Barriers: Unprotected penetrations in fire-resistance rated assemblies and the absence of fire dampers in ventilation shafts permitted fire and smoke to spread vertically and horizontally.
  • Ventilation openings in the stairway enclosures permitted smoke to migrate into the stairways, complicating firefighting.
  • Unprotected openings in the enclosure walls of 22nd floor electrical closet permitted the fire to impinge on the primary and secondary electrical power risers.
  • Standpipe System and Pressure Reducing Valves (PRVs): Improperly installed standpipe valves provided inadequate pressure for fire department hose streams using 1 3/ 4-inch hose and automatic fog nozzles. Pressure reducing valves were installed to limit standpipe outlet discharge pressures to safe levels. The PRVs were set too low to produce effective hose streams; tools and expertise to adjust the valve settings did not become available until too late.
  • Locked Stairway Doors: For security reasons, stairway doors were locked to prevent reentry except on designated floors. (A building code variance had been granted to approve this arrangement.) This compelled firefighters to use forcible entry tactics to gain access from stairways to floor areas.
  • Fire Department Pre-Fire Planning: Only limited pre-fire plan information was available to the Incident Commander. Building owners provided detailed plans as the fire progressed.
  • Firefighter Fatalities: Three firefighters from Engine Company 11 died on the 28th floor when they became disoriented and ran out of air in their SCBAs.
  • Exterior Fire Spread: “Autoexposure” Exterior vertical fire spread resulted when exterior windows failed. This was a primary means of fire spread.
  • Structural Failures: Fire-resistance rated construction features, particularly floor-ceiling assemblies and shaft enclosures (including stair shafts), failed when exposed to continuous fire of unusual intensity and duration.
  • Interior Fire Suppression Abandoned: After more than 11 hours of uncontrolled fire growth and spread, interior firefighting efforts were abandoned due to the risk of structural collapse.
  • Automatic Sprinklers: The fire was eventually stopped when it reached the fully sprinklered 30th floor. Ten sprinkler heads activated at different points of fire penetration.
  • The three firefighters who died were attempting to ventilate the center stair tower: They radioed a request for help stating that they were on the 30th floor. After extensive search and rescue efforts, their bodies were later found on the 28th floor. They had exhausted all of their air supply and could not escape to reach fresh air. At the time of their deaths, the 28th floor was not burning but had an extremely heavy smoke condition.
  • After the loss of three personnel, hours of unsuccessful attack on the fire, with several floors simultaneously involved in fire, and a risk of structural collapse, the Incident Commander withdrew all personnel from the building due to the uncontrollable risk factors. The fire ultimately spread up to the 30th floor where it was stopped by ten automatic sprinklers.

Take the time to review this report and examine some of similar issues affecting the fire service today in the areas of staffing and resources, construction and materials, building codes, built-in fire suppression systems, training, pre-fire planning, fire load, fire dynamics and the current methodologies on wind-drive fire theory. 

Building Overview NarrativeOne Meridian Plaza was a 38-story high-rise office building in downtown Philadelphia, Pennsylvania. Located across from Philadelphia’s City Hall, it was originally constructed in 1972 as the headquarter building for the Girard Bank. By 1991 it housed 27 tenants, and was the regional headquarters for Meridian Bancorp, which occupied eight floors (Menkus 1992). The rectangular building was 243 feet long and 92 feet wide, and contained about 17,000 net usable square feet per floor. Refer to Plan below for a typical floor plan from One Meridian Plaza. The lower two floors of the tower were below grade, floors 12 and 38 housed mechanical equipment, and the roof contained access via two helipads. The building frame was structural steel with composite metal decking, and the structure was also joined on the east side by a connecting link and stairwell to the 34-story Girard Trust Building. In compliance with all codes available in 1972, the building was classified and fireproofed as equivalent to BOCA Type 1B construction (Chubb 1991). The structural steel was protected with spray-on fireproofing, and sprinklers were not required by code, so they were not installed. In 1984 Philadelphia adopted the National Building Code, which required that newly constructed buildings 75 feet high be fully sprinklered. One Meridian Plaza was grandfathered and not required to install sprinklers due to the high installation and retrofit costs (Post March 1991). By 1991, only nine floors of the building had working sprinkler systems. These systems had been installed at the request of the tenants occupying those levels (Mangan 1991). 

Typical Floor Plan (22nd Floor)

Here’s a story posted today at the Phildalphia Daily News with insights on this anniversary 

One Meridian Plaza: 20 years ago, the fire that changed the nation By NATALIE POMPILIO Philadelphia Daily News 

When Jack Bloomer and the other firefighters arrived at One Meridian Plaza that cold February night in 1991, flames were encompassing the building more than 20 stories above, leaping from floor to floor. Smoke poured into the air, and broken glass rained down. 

“It was obvious when we pulled up it was an ugly-looking job,” Bloomer, 61, remembered yesterday. 

He had no idea how bad it would get. 

By the time the 12-alarm fire was declared under control 19 hours later, three firefighters were dead, 12 others were injured and a Center City high-rise was lost. The blaze, 20 years ago today, changed the city’s skyline and the way the nation fights fires. 

“When that fire happened, it was on the news all over the world,” said Chris Jelenewicz, engineering program manager at the Maryland-based Society of Fire Protection Engineers. “The One Meridian fire was one of the most significant fires in the history of high-rise buildings.” 

The fire changed Bloomer, who was driving Engine 11 that night. With him were Capt. David Holcombe and Firefighters Phyllis McAllister and James Chappell. 

Bloomer’s the only one who made it home. Read the entire article HERE 

Jack Bloomer was the only survivor from his platoon. David Holcombe, Phyllis McAllister and James Chappell perished in the Feb. 23 high-rise inferno

  • One Meridian Plaza Photo Slide Show HERE
  • NFPA Summary Report HERE

Other Insights: Good Article related to design, construction and failure issues HERE 

Excerpts: At about 8 p.m. on Saturday, 23 February 1991, linseed oil-soaked rags left behind by a cleaning crew burst into flames on the 22nd floor of the 38-story One Meridian Plaza in downtown Philadelphia. The fire quickly spread, unimpeded by fire sprinklers, throughout the 22nd floor and then upward. Sprinklers were not required by the City’s building code at the time of construction and were being added to the building only as opportunity presented itself. 

The twelve-alarm fire burned for 18 hours. The extreme heat caused window glass and frames to melt and concrete floor slabs and steel beams to buckle and sag dramatically. Large shards of window glass fell from the facade, cutting through fire hoses on the ground around the building. Three firefighters were trapped on a fully engulfed floor, and efforts to rescue them failed. 

The fire would not yield and there were increasing concerns about the stability of the structure. Fire officials called off the attack and allowed the fire to “free burn,” concentrating their efforts on containing the fire to this building. When the fire reached the 30th floor, a tenant-installed fire-sprinkler system was activated, and the worst high-rise fire in U.S. history was finally brought under control. 

Other Notable High-Rise Fires 

First Interstate Bank Building – Los Angeles, California

On May 4, 1998, the 62-story First Interstate Bank Building in Los Angeles, California experienced a devastating fire that damaged five of the building’s floors before it was brought under control. It is thought that the fire was the result of an electrical malfunction, but the cause was actually never determined. The building was in the process of being retrofit with an automatic sprinkler system, which had been installed in about 90 percent of the building, but was not operational at the time of the fire. Security personnel dismissed initial fire and smoke alarms, which delayed the response of the fire department by almost 15 minutes. Also contributing to the spread of the fire was the large quantity of combustible materials on each floor, equipment penetrations and other openings, and a standpipe system that had been shut down due to the sprinkler installation. Firefighters were also forced to battle dangerous conditions that were created by the failure of the glass façade and its subsequent fall to the ground below. The fire was eventually extinguished with the internal standpipe system, but not before one death and over 50 million dollars worth of damage (Routley 1988). 

Schomburg Plaza – New York, New York

The fire at Schomburg Plaza was unusual in the fact that it originated in the upper sections of a trash chute that serviced the 35-story apartment building. The March 22, 1987 fire started somewhere between the 27th and 29th floors, and then traveled up the trash chute and through the walls into surrounding apartments. Investigations following the fire found that sprinklers in the chute either failed to work because they were clogged, or were not actually connected to the piping system. It was also determined that the building was not built according to its plans, and therefore certain areas did not meet the two hour fire rating required by code. A final issue was the initial response to the fire and the misconception that it was a common compactor fire, as had been seen several times before. Neither firefighters, nor dispatchers realized the severity of the fire, and initially believed that it was under control, which created an even more dangerous situation. As a result of this fire, seven people lost their lives (Schaenman 1987). 

High-Rise Condominium – Clearwater, Florida

A more recent high-rise fire occurred on June 28, 2002, in an 11-story condominium building in Clearwater, Florida. The fire originated in the kitchen of a fifth floor apartment, and instead of pulling the fire alarm and alerting the fire department, the tenant tried unsuccessfully to extinguish the fire. This delay allowed the blaze to grow for 17 minutes before the fire department was even notified. As firefighters arrived on the scene they encountered several problems, including radio communication issues, closed standpipe riser valves, and a damaged fire hydrant. Another issue was that some building residents ignored fire alarms and failed to evacuate, believing that it was false alarm. The building was not equipped with an automatic sprinkler system, and therefore several units and the central hallway were heavily damaged by fire, smoke, and water before the blaze was declared under control. In the end two people were killed and many more were injured. The tragedy resulted in one million dollars worth of damage and the installation of an automatic sprinkler system. 

 

Feb. 24, 1991: A Medevac helicopter takes off from 15th Street about 1:30 a.m. Sunday to take urgently needed fresh air bottles to the roof. The bottles were not in time for three of the firefighters. (Mike Levin / Inquirer files)

 

 
 
 
 

 

  

Multiple Alarm Operations with Wind Driven Fire

No comments

The five alarm fire that ran through a seven story multiple occupancy (MO) apartment building in the Flatbush Section in the Borough of Brooklyn (NYC) this weekend considerably challenged operating companies of the FDNY as the fire was fueled and spread in rapid success due to significant wind conditions compounded by news reports that a door to the fire compartment was left open, thus allowing the developing fire conditions to intensify and escalate due to the wind driven conditions that were impacting the building, the fire compartment and initial operating companies.     

Aerial View of the Apartment Building

The seven-story MO Apartment building at 346 East 29th Street is reported to have had 70 apartments and was located midway in the city block. Arriving companies reported a fire on the number four floor and quickly deployed handlines and initiated primary search and rescue and other tactical assignments.   

Street View

First-due operations, from the initial alarm assignment’s arrival, the transmission of size-up communications and the accurate and timely deployment of companies to task assignments is mission critical to an evolving incident.     

The introduction of other challenges such as confronted by FDNY at this alarm further magnify the importance of effective command risk assessment, building size-up, effective and efficient company assignments and deployments with adequate resources (staffing and companies) to intervene with the fire dynamics and growth of an initial developing room and contents to an extending and escalating structure fire.      

       

YouTube Preview Image       

   

Take a few minutes to listen to the radio transmissions on the audio file attached, paying particular attention to the exchange of dispatch communications, first-due size-up and actions, command transmissions and subsequent rapid transmittal of greater alarms, as fire ground operational conditions deteriorated due to the wind driven fire, fire extension, civilian’s in distress and rescue operations.   

Think about the way you would react, interface or address similar conditions and challenges at an alarm in your jurisdiction or department.   

  • Do you have the necessary skills and experience to address timely actions required of company and command officers at a wind drive fire incident?
    • Are you capable of addressing a large single family dwelling, or a large low rise MO apartment building? How about a townhouse or garden apartment complex building?
    • How familiar are you with strategic and tactical considerations wind drive fire incidents?
    • Are you aware of the recent research and operational factors and considerations coming out of emerging research from the NIST and UL?
    • How effective are your capabilities for operating at large scale multiple alarm incidents with your department’s resources, or with mutual aid or external agencies?
    • Have you trained and prepared to manage multiple alarm incidents?

      

Take some to time to gain some insights from this alarm; the communications and the challenges and make this a learning opportunity to gain some insights into wind drive fire theory and operational considerations.   

Here’s some mission critical links and references to make you a more effective and capable company and command officer.   

National Fire Academy On-Line Training Program   

Awareness of Command and Control Decision making at Multiple Alarm Incidents (Q297) 1.5 CEUs Enroll Now »  

This course is both a stand-alone course as well as the pre-course for the 6-day residential delivery of the National Fire Academy’s new Command and Control Decision Making at Multi-Alarm Incidents. Anyone interested in applying for the 6-day residential course must pass this pre-course with a score of 85 percent. The topics covered in this pre-course include: classical and naturalistic decision making, strategies for managing safety concerns at expanded emergency incidents, pre-incident preparation, resource allocation, effective use of on-site communications, set-up of an incident command post and post incident analysis.

NIST: Fire Fighting Tactics Under Wind Driven Fire Conditions: 7-Story Building Experiments. HERE  

 February 2008, a series of 14 experiments were conducted in a 7-story building to evaluate the ability of positive pressure ventilation fans, wind control devices and external water application with floor below nozzles to mitigate the hazards of a wind driven fire in a structure. Each of the 14 experiments started with a fire in a furnished room. The air flow for 12 of the 14 experiments was intensified by a natural or mechanical wind.. Each of the tactics were evaluated individually and in conjunction with each other to assess the benefit to fire fighters, as well as occupants in the structure. The results of the experiments provide a baseline for the hazards associated with a wind driven fire and the impact of pressure, ventilation and flow paths within a structure. Wind created conditions that rapidly caused the environment in the structure to deteriorate by forcing fire gases through the apartment of origin and into the public corridor and stairwell. These conditions would be untenable for advancing fire fighters. Each of the tactics were able to reduce the thermal hazard created by the wind driven fire. Multiple tactics used in conjunction with each other were very effective at improving conditions for fire fighter operations and occupant egress. Fire departments that wish to implement the tactics used in this study will need to develop training and determine appropriate methods for deploying these tactics. Variations in the methods of deployment may be required due to differences in staffing, equipment, building stock, typical weather conditions, etc. There is uniformity however, in the physics behind the wind driven fire condition and the principles of the tactics examined. The data from this research will help provide the science to identify methods and promulgation of improved standard operating guidelines (SOG) for the fire service to enhance firefighter safety, fire ground operations, and use of equipment. The experiments were conducted by the National Institute of standards and Technology (NIST), the Fire Department of New York City (FDNY), and the Polytechnic Institute of New York University with the support of the Department of Homeland security (DHS)/Federal Emergency Management Agency (FEMA) Assistance to Firefighters Research and Development Grant Program and the United States Fire Administration.  

pdf icon Fire Fighting Tactics Under Wind Driven Fire Conditions: 7-Story Building Experiments. (58118 K)
Kerber, S. I.; Madrzykowski, D.  

NIST Wind Driven Fires Studies, HERE  

Smoke and heat spreading through the corridors and the stairs of a building during a fire can limit building occupants’ ability to escape and can limit fire fighters’ ability to rescue them.  Changes in the building’s ventilation or presence of an external wind can increase the energy release of the fire.  This can also increase the spread of fire gases through the building.  In some cases, such as the Cook County Administration Building fire in October 2003, the fire gas flow, into the corridors and the stairway prevented fire fighters from suppressing the fire from inside the structure.  This fire resulted in 6 building occupant fatalities and fire fighter injuries in the stairway.  The Fire Department of New York City has experienced many wind driven fire incidents which have resulted in fire fighter fatalities and injuries.  

 

Postings from Buildingsonfire.com

 

Direct link to the Wind Driven Fire Research Postings on Buildingsonfire.com  HERE 

NIST Wind Driven Fire Simulation Video

NIST Wind Driven Fire Simulation Video Wind Driven Fires Smoke and heat spreading through the corridors and the stairs of a building during a fire can limit building occupants’ ability to escape and can limit fire fighters’ ability to rescue them.  Changes in the building’s ventilation or presence of an external wind can increase the [...]  

Jan, 29 2011 0 Comments Full Story

Positive Pressure Ventilation Research

Positive Pressure Ventilation The objective of this NIST research is to improve firefighter safety by enabling a better understanding of structural ventilation techniques, including positive pressure ventilation (PPV) and natural ventilation, and to provide a technical basis for improved training in the effects of ventilation on fire behavior by examining structural fire ventilation using full-scale fire experiments with and [...]  

Jan, 14 2011 0 Comments Full Story

NIST Wind Driven Fires Programs

Wind Driven Fires Wind blowing into the broken window of a room on fire can turn a “routine room and contents fire” into a floor-to-ceiling firestorm. Historically, this has led to a significant number of firefighter fatalities and injuries, particularly in high-rise buildings where the fire must be fought from the interior of the structure. [...]  

Jan, 14 2011 0 Comments Full Story

Wind Driven Fires

 A million dollar Baltimore County, Maryland  home was destroyed Sunday December 13, 2009  by a fire that tore through the 4,700-square-foot structure with such intensity that firefighters were forced to battle the flames from the exterior. Shortly after 21:00 hours, Baltimore County Fire Dispatch alerted crews for Fire Box 50-2 at 12607 Nancy Lee Court [...]  

Tactical Patience and the New Considerations of Ventilation on Fire Behavior in Legacy and Contemporary Residential Construction  on CommandSafety.com HERE, with insights into the new UL Impact of Ventilation on Fire Behavior in Legacy and Contemporary Residential Construction

   

ALARM INFORMATION
FDNY
   Brooklyn, N. Y. 02/19/11 @ 18:45 hrs.
Flatbush Section Box 2439 address: 346 East 29th St. between: Ave. “D” & Clarendon Rd.
     

2439 @ 18:42
Engs. 255, 281, 217 act. 310
T. Lad. 157, Lad. 147
Batt. 41      

10 – 75 – 2439 @ 18:46
Ladder 113 is designated as the “FAST” Truck
Eng. 249
Rescue Co. #2
Squad Co. #1
Batt. 48
Division 15      

Fire Building:
6 Story Brick 100 x 100 O/M/D ( orig. reported )
7 Story Brick 100 x 100 O/M/D ( actual size up )      

All – Hands:
7 – 5 – 2439 @ 18:48
Batt. 41 reports: All – Hands upon arrival, extra Engine & Truck
Fire 4th floor of a 6 Story Brick occupied multiple dwelling
Engine 250 / Ladder 174 s/c      

“Batt. 41 to Brooklyn, Transmit a 2nd Alarm, We also transmitting a 10-70 ( water relay )      

2nd Alarm:
2 – 2 – 2439 @ 18:53
Engs. 310, 240, 283 ( Eng. 310 designated Water Resource Unit )
T. Lad. 159, Lad. 149
Eng. 284 w/ Satellite 3
Batt. 38 “Safety Officer”
Batt. 33 “Resource Unit Leader”
Rescue battalion / Safety Battalion
Fieldcom 1 / Tactical Support Unit #2      

@ 18:58
Batt. 41 to Brooklyn, We have a “May-Day” transmitted from the Fire Apt. We’re putting the “FAST” Truck to work. Assigned another “FAST” Truck, Tower Ladder 159 is assigned new “FAST” Truck      

@ 19:13
Division 15 reports: “May-Day” member located and removed from Fire Bldg. We have fire on the 4th & 5th floors out the rear.
4 – lines stretched, 4 – lines in operation. Fire’s Doubtful.      

3rd Alarm:
3 – 3 – 2439 @ 19:15
Engs. 309, 323, 257, 330
Lad. 123, T. Lad. 170
Batt. 58
Batt. 44 “Staging Manager”
Air Re-Con Chief “grounded” due to winds
Mask Service Unit #1
Staging Area: Clarendon Rd. & Nostrand Ave.      

@ 19:20
Division 15: Box 2439, We have fire on the 4th; 5th; & 6th floors and into the Cockloft. All members being removed from the upper floors, setting up the Tower Ladders.      

@ 19:27
Special Call ( 2 ) additional Battalion Chief’s
Batt. 40 act. 58, Batt. 32 are s/c      

@ 19:30
Special Call a “High Rise Nozzle Co.” Eng. 254 assigned      

@ 19:36
Special Call ( 2 ) Tower Ladders
Tower Ladder 144 act 153 & Tower Ladder 120 are s/c      

4th Alarm:
4 – 4 – 2439 @ 19:38
Engs. 276, 220, 247, 321
Batt. 57 “Planning Chief”
Eng. 262 w/ Incident Management Vehicle
Car 4: Chief Robert Sweeney “Chief of Operations”      

@ 20:39
Fieldcom 1: Progress Report for the 4th Alarm, Box 2439, Car 4, Chief Sweeney reports:
Fire in a 6 Story Brick occupied multiple dwelling. ( 3 ) Tower Ladders in operation in the rear of the Fire Bldg. ( 1 ) Tower Ladder in operation in the front of the Fire Bldg. Setting up 2nd Tower Ladder in the front of the Fire Bldg. ( 1 ) Stang in operation in the rear. Have ( 3 ) floors of fire out the rear of the Fire Bldg. Doubtful Will Hold.      

@ 20:44
Fieldcom 1: By orders of Chief Kilduff, transmit the 5th Alarm.
Special Call ( 2 ) additional Engines above the 5th Alarm for “Brand Patrol”      

5th Alarm:
5 – 5 – 2439 @ 20:44
Engs. 234, 280, 282, 227
Engs. 290 & 214 s/c for “Brand Patrol”
Car 3: Chief Edward Kilduff “Chief of Department”      

@ 20:58
Fieldcom 1: Progress Report for the 5th Alarm, Box 2439, Car 4, Chief Sweeney reports:
Primary Searches on the 4th floor are negative except for Apt. 4 “adam”      

@ 21:13
Fieldcom 1: Special Call ( 2 ) additional Trucks to the Staging Area.
Ladder 132 & Tower Ladder 111 are s/c      

@ 21:22
Fieldcom 1: At this time, We’re releasing Rescue #2 & Squad #1      

@ 21:26
Fieldcom 1: Progress Report for the 5th Alarm, Box 2439, Car 4, Chief Sweeney reports:
All members have been removed from the Fire Bldg. ( 3 ) Tower Ladders in operation in the front of the Fire Bldg. ( 2 ) Tower Ladders & ( 1 ) Stang in operation in the rear of the Fire Bldg. Still have heavy fire on the 4th; 5th; & 6th floors. This will be a pro long operation. Still Doubtful.      

@ 22:15
Fieldcom 1: Progress Report for the 5th Alarm, Box 2439, Car 3, Chief Kilduff reports:
( 3 ) Tower Ladders in operation in the front of the Fire Bldg.
( 2 ) Tower Ladders and ( 1 ) Multi-Versal in operation in the rear of the Fire Bldg. Fire is darkening down on the 4th & 5th floors in the rear. Fire is Still Doubtful.      

@ 22:58
Fieldcom 1: Progress Report for the 5th Alarm, Box 2439, Car 4, Chief Sweeney reports:
Probably Will Hold
The Bldg. has been changed to a 7 Story Bldg. Fire was on the 5th; 6th; & 7th floors and Cockloft.      

@ 23:10
Fieldcom 1: Special call Eng. 233 with Mobile Command 1      

@ 23:12
Fieldcom 1: Special Call ( 1 ) Division Chief, & ( 3 ) Battalion Chiefs for “relief”
Batt. 4, Batt 31 act. 41, Batt. 49 are s/c
Division 1 s/c      

@ 23:18
Fieldcom 1: Special Call ( 3 ) additional Engine’s, ( 3 ) additional Tower Ladders for “relief”
Engs. 330, 248, 220
T. Lads. 107, T. Lad. 161 act. 157, T. Lad. 15 act. 131      

@ 01:58
Fieldcom 1: By order’s of Division 1, Fire is Under Control.      

(Job Duration: 7 hrs./16 mins.)      

Note: 2 Engines, 2 Trucks, 1 Batt. Chief will be Special Called on intervals to support a “watch line”      

( 1 ) 10-45 Code 1 (deceased was located in the Fire Bldg.)   

Operational Conditions can Change in a Heartbeat: Remembering FDNY Black Sunday

No comments

Take the time to read both NIOSH reports and remember the sacrafice…

Three veteran FDNY firefighters died in the LODD in Brooklyn, New York and the Bronx on Sunday January 23, 2005, a day that has become known as “Black Sunday” and called one of the saddest in fire department history. Two firefighters were killed and four others were badly hurt when they were forced to jump from a fourth-floor window of a burning building in the Bronx.

Later, a third firefighter died after tackling a basement blaze in Brooklyn.Lt. Curtis Meyran, 46, of Battalion 26, and Firefighter John Bellew, 37, of Ladder 27, died after battling the Bronx blaze on East 178th Street in the Morris Heights section.

Three firefighters were in critical condition at St. Barnabas, and a fourth was in serious condition at Jacobi Medical Center. Six Bronx firefighters became trapped in the building while searching for people on the fourth floor. When the fire from the third floor broke through to the fourth, they were faced with a horrifying choice. They jumped out a fourth-floor window, knowing that they would be critically injured.

Firefighters Jeffrey Cool, Joseph DiBernardo, Eugene Stolowski, and Cawley were badly hurt in the Bronx fire. They were trapped on the fourth floor and were left with the life-or-death choice of leaping 50 feet or burning up. The Brooklyn firefighter, Richard Sclafani, 37, died at a hospital after being injured at a two-alarm fire in the East New York section.

Leadership Defined

No comments

   

   

Dick Winters, the former World War II commander whose war story was told in the book and miniseries “Band of Brothers,” died on January 2, 2011 at the age of 92. Dick Winters led a quiet life on his Fredericksburg farm and in his Hershey (PA)  home until the book and miniseries “Band of Brothers” threw him into the international spotlight. Since then, the former World War II commander of Easy Company had received hundreds of requests for interviews and appearances all over the world.  

Winters was always gracious about his new-found celebrity, but never really comfortable with it. He never claimed to be a hero and said that he had nothing to do with the national effort to get him the Medal of Honor, the nation’s highest military honor.  

When people asked him if he was a hero, he liked to answer the way his World War II buddy, Mike Ranney, did.  

“No,” Ranney said. “But I served in a company of heroes.” That became the tag line for the miniseries.   

In an interview shortly before the miniseries debuted, Winters said the war wasn’t about individual heroics. The men were able to do what they did because they became closer than brothers when faced with overwhelming hardships. They weren’t out to save the world. They hated the blood, carnage, exhaustion and filth of war. But they were horrified at the thought of letting down their buddies.  

On D-Day, June 6, 1944, Winters and his troops from Easy Company, 506th regiment of the 101st Airborne Division, parachuted behind enemy lines to take on a German artillery nest on Utah Beach. Winters made himself a promise then that if he lived through the war, all he wanted was peace and quiet. His company fought through the Battle of the Bulge, the liberation of a death camp at Dachau and to Hitler’s Eagle’s Nest at Berchtesgaden.  

The war described in “Band of Brothers” is ugly, but the young men developed character under fire, Winters said. He was glad the miniseries showed war realistically, not either glorified or demonized as in so many movies. He wanted people to understand that success in war depends not on heroics but on bonding, character, getting the job done and “hanging tough,” his lifelong motto. In combat, he wrote 50 years after the war, “your reward for a good job done is that you get the next tough mission.”  

When the war ended, Winters kept his promise to himself. He married Ethel, bought a bucolic farm in Fredericksburg, raised two children and worked in the agricultural feed business. He didn’t talk about the war until the late historian Stephen Ambrose wanted to put Easy Company’s exploits on paper.  

Following the miniseries, Winters turned down most requests for interviews because he said he didn’t want to appear like he was bragging. But he did feel the story of Easy Company was an important one, especially for young people. He was more likely to accept invitations by local school groups and spent time with students at local High School, among others.  

  • People who knew Winters during and after the war said he is exactly what he appears to be.
  • He could lead without ever raising his voice or swearing.
  • His friend Bob Hoffman, a Lebanon architect, said Winters’ eyes could “burn a hole right through you.”
  • The men who served under him and people who only met him later in life call him a hero, no matter what he says.
  • According to the book, one wounded member of Easy Company wrote Winters from a hospital bed in 1945, “I would follow you into hell.”
  • He received a standing ovation from 500 veterans when he spoke at the dedication of the Army’s Military History Institute in Middlesex Township in September. When President Bush was in Hershey, PA in April, he called Winters “a fine example … for those brave souls who now wear our nation’s uniform.” 

Tom Hanks, who co-produced the HBO  series, and from the actor who played Winters in “Band of Brothers.” “When our days run their course and a man like Dick Winters leaves us, time and providence remind us that human beings can do giant things,” Hanks said in a statement. “Dick Winters volunteered to go to war, leading paratroopers into unknown, yet certain, dangers. He led by both command and example; his wartime philosophy was simple — ‘Follow me.” He  died quietly, in private, without fanfare and with the same modesty that he lived his life as one of the true heroes of his generation,” Lewis added.  

Ambrose, the author of “Band of Brothers,” said in a 2001 BBC interview that he hopes young people say. “I want to be like Dick Winters.”  

“Not necessarily as soldiers, but as that kind of leader, that kind of man, with basic honesty and virtue and an understanding of the difference between right and wrong,” Ambrose said.   

Gen. David Petraeus, who has commanded the 101st Airborne Division during his career, said in a statement on this week that “Major Winters embodied the very best of what a leader and soldier should be. He and the men of Easy Company lived the “brotherhood of the close fight.”  

The Company Officer fulfills a mission critical role within the fire service that directly affects personnel and public safety and community accord. The title carries with it the opportunity to ride the “front seat” and be in charge of a company responsible for addressing incident operations and service demands dictated by the company’s function, responsibility and task assignment. (These paragraphs have been assembled from a variety of recent articles celebrating the life of Dick Winters and best conveyed the essence of who that man was. All rights reserved)  

As a practicing, aspiring, or emerging Company or Command Officer, there is much written and much said about Leadership. There are numerous books written on the suject, but sometimes it’s the simple virtues, values and morals that define and exemplify leadership. We have all served or continue to serve in [a] company of heroes. Quietly serving our citizens and the public at large. Think about what defines you and how you are defined within your company, the station, within the department or within your private life. Stop and reflect…. 

  • Recognizing the various avenues available that place a firefighter in transition from a individual contributor to that of a first-line supervisor; whether thru examination, assessment, appointment or popular vote, there are essential functions and elements that the title bestows.
  • The title also carries with it an immense responsibility, obligation, duty and accountability. It’s much more than a set of collar brass and new front helmet shield. 
  • Understand what the true meaning of leadership is; and how it conveys to the fireground and within our company missions and task assignments during structural combat fire engagement.
  • If you haven’t taken the time to read two insightful books, I would encourage you to read up; 

Beyond Band of Brothers

 

Band of Brothers

 

Related Posts with Thumbnails