Taking it to the Streets and Reading the Building: Side by Side

No comments

Taking it to the Streets and Reading the Building: Side by Side Photo By; CJ Naum

 

Taking it to the Streets and Reading the Building: Side by SideToday’s Street view and Reading the Building opportunity is focused on a large building complex.

At first glance it looks like one BIG building. However, closer scrutiny reveals there are three (3) building occupancies sharing common party walls.

What gives you the first appearance that this may be one building versus three structures?  There are a couple of immediate features that can take you down the wrong path if you’re not familiar with the building type, the inherent features as well as the apparent alterations that are now influencing it.

Reading the Building requires skill sets to keeping looking further beyond what is immediately obvious; that successive layers of observations upon arrival and fluid assessment expose other pertinent, Building, Structure, System, Occupancy and Operational Risks, hazards and Considerations in the development of the incident action plan and determination of strategic, tactical and task objectives and assignments.

Here are our Buildingsonfire Street Questions:

  • Identify the Building Type(s)
  • Can you differentiate the structural system present?
  • How many buildings are there and why?
  • What if inherent with the Building and Features?
  • What is obvious from the Alpha Street Side?
  • There are observable features that will be mission-critical related to Building Performance, can you identify?
  • What is the expected Predictability of Performance of the buildings and occupancy areas?
  • Occupancy Risk is projected to be what?
  • Looking at the alleyway on the Delta Division, what can you identify that would be of importance to the IAP and company operations, both interior and exterior.
  • What is the expected of the Perimeter Walls (PW)?
  • Fire Travel and Propagation: Do you know what to project, anticipate and plan for?
  • Operational risk might be what given moderate fire with extension on an upper floor?
  • Give yourself some added considerations based on either: Engine Co., Truck/Ladder Co., Rescue/Squad Co., Commander (IC) or RIT/FAST role responsibilities;
  • What questions would you seek to identify and answer or assume on the first-due as you read the building?

That’s plenty to keep you going…

Checkout the comments and interactions on Buildingsonfire on Facebook HERE and don’t forget to to LIKE and pass the link along

Here’s a PDF that you can download and share with the company, at the station or use of a quick in-service drill; HERE StreetsSidebySide

Taking it to the Streets: Columbus

No comments
Here’s a new Building to Read. What do think the Structural System and assemblies are compromised of?
  • What does the building envelope look like.
  • What type of structural systems might be present?
  • What would the least favorable system be?
  • Projected occupancy load: Operational concerns for a major floor fire?
  • Fire Extension probability?
  • Occupancy Type?
  • Occupancy Risks?
  • First-Due Company or Command Officer critical operational considerations?
  • Predictability of Building Performance: Lots more here than meets the eye on the first glance….
  • What are the projected operational risks?

    Reading the Building: Taking to the Streets- Risk and Profile? Photo by CJ Naum

 
 
  • Here’s the direct link to this discussion: HERE
We’re expanding our interactive postings on Buildingsonfire on Facebook. If you haven’t checked them out, do so.
Plenty of interactive postings and discussions.
  • Don’t forget to LIKE Buildingsonfire on FaceBook and CommandSafety on Twitter
  • We post frequent interactive sessions on Buildingsonfire on Facebook. 
  • Look for Ten Minutes in the Street returning to TheCompanyOfficer.com in March…..coming soon with new interactive and expanded content

 

 

Central Ohio FOOLS Training Opportunity

No comments

 

 

Central Ohio FOOLS presents

Adaptive Fireground Management for the Company and Command Officer

 This program presents insights into emerging concepts and methodologies related to the unique challenges during combat structural fire engagement that require refined strategic, tactical and operational modeling due to extreme fire behavior, building construction and occupancy risk. The principles of Adaptive Fire Ground Management (AFM) will be presented along with integrated discussions on:

  • Predictive Risk Management, Command Resiliency, Tactical Patience & integration of Five-Star CommandTM model will be presented with discussion on key Building Construction Systems and Occupancy Risk factors for company effectiveness, operational excellence and firefighter safety
  • The program will integrate key case studies, lessons from the fireground, insights into emerging fire ground tactical theory with a focus of understanding occupancy risk with today’s Buildings on fire.  
  • This is an interactive and thought provoking program that challenges conventional fire service paradigms and explores leading edge theories and fire service discussion points from across the American Fire Service profession.
  • This program is for ALL levels of rank and experience, not just officers.

Friday  March 8th, 2013 • 0900-1600 hrs. Ÿ $50.00 per Student

Registration Opens at 8am Columbus FF Union Hall

Station 67, 379 Broad Street, Columbus, OH 43215

CEU: 6 hrs. Provided by Columbus State Community College | Meet & Greet Immediately Following

 Point of Contact: Jason Kay (614) 65-FOOLS, fools@centralohiofools.com

Registration: www.centralohiofools.com via PayPal

 Visit Buildingsonfire.com ∙ Buildingsonfire on Facebook and Twitter  

Program PDF: HERE: CentralOhio_ FOOLS

Occupancy Risk and Performance

No comments

What’s the Occupancy Risk? Photo courtesy of Buildingsonfire.com

Occupancy Risk and Operational Concerns

Take a look at this interior shot of the following occupancy:
Discuss this with your company, officers or station to identify the;
  • Suggested Building Construction Type,
  • Suggested Occupancy Type,
  • Construction System,
  • Operational Risks and Hazards, 
  • Fireground concerns if there was a fire in this Compartment/Building
  • What is Obvious?
  • What needs to be further assessed or identified?
  • What Inherent Building Profile and Performance Concerns area there?
  • What does the Company Officer need to know abouth this Building | Occupancy | Construction System | Compartment?
  • Are there unique tactical operational concerns for Engine |Ladder/Truck | Rescue |Support?
  • What about Command operational concerns?

Building Knowledge = Firefighter Safety

Know your World

Follow Buildingsonfire on Facebook

 

Three Firefighters Injured in Residential Collapse

No comments

Cherokee County Fire and Emergency Services

 

Cherokee County Fire and Emergency Services

Cherokee County (GA) Fire and Emergency Services and Woodstock (GA) Fire Department personnel responded to a structure fire at 811 Commons Court, located in the Kingston Square Subdivision, off Highway 92, just east of Woodstock (GA) sunday night for a reported fire in a residential structure; with reports of trapped occupants. During suppression operations, three Cherokee County firefighters were trapped in the basement for a short period of time due the catastrophic collapse of a front wall-floor assembly resulting in the collapse of the entry porch floor system on the alpha division.

Cherokee County 911 received the call of the fire at 1:30 Sunday regarding a structure fire with possible entrapment. Firefighters quickly responded to the scene to find the house fully involved and began a defensive attack. Two Cherokee County firefighters and one Woodstock firefighters were standing on the porch of the structure when it collapsed. The three firefighters were pulled from the burning structure and were later taken by ambulance to Marietta’s Kennestone Hospital.

According to information posted on the Cherokee County Fire and Emergency Services web site and other published media reports,  two Cherokee County Firefighters were treated and released and one firefighter  is still in ICU at a local hospital, struggling to survive; with smoke inhalation and lung injuries resulting from the falling bricks that struck him during the collapse.

According to one report, the three engine company firefighters were operating a handline for an exended period of time on the porch of the home  (Alpha side) when the floor and wall assembly gave way beneath them, sending them tumbling into the basement below. The adjacent wall and canopy fell on top of the firefighters after falling into the area below.  An aerial view of the residence shows a raised ranch style structure with a garage and basement configuration below the main floor. According to public records, the single family wood frame house was built in 1986 and was comprised of 1,910 square feet of occupied space, with three bredrooms.

Aerial View of the Residential Occupancy (Bing)

Unfortunately due to the degree of fire involvment and susequent collapse, firefighters were unable to reach the elderly couple, a 78 year old man and his 77 year old wife, who perished in the early morning fire. The couple’s daughter and her 25 year old son were also living with the couple and they escaped without injury.

We posted some extensive information over at CommandSafety.com related to two past LODD events from 2006 and 2009 along with a number of pertainent informational links realted to floor collapse, firefighter near miss events involving floor compromise and collapse.

Take some time to link over to our sister site and check out the information. (HERE)

We’ll follow up on this event to see if we can gain further insights related to the structural conditions, construction features and contributing factors that lead to the floor collapse.

 
 
 
 

 

Deployment Decisions: Defining Operations on the First-Due

No comments

First-due company operations are influenced by a number of parameters and factors; some deliberate and dictated, others prescribed and prearranged and yet others subjective, biased, predisposed or at times accidental, casual and emotional. For many of you riding the seat or arriving assuming command; you understand the connotations and implications I’m making here.

Here’s an excellent discussion and debate point to bring up, when time permits today or this evening with your company or personnel; one that leads to a multitude of viewpoints, opinions and divisions.

On the first-due; what are the three or four key parameters when confronted with arrival indications of a fire within a structure that define your deployment and transition into operations?

Now, before everyone gets worked up; we all realize there are numerous variables affecting key decision-points that must be recognized, imputed, synthesized , analyzed and decisions made, assignments formulated and the task deployed; this list can be long – very long.

However, giving a building and occupancy with indications of a fire within, what has your experience provided you with the KEY influencing parameters? Are there key factors, or are there “lists” of factors based upon yet another “list” of conditions. The question is rhetorical the answeres are not.

Is it occupancy type, occupancy risk, fire behavior or fire dynamics, time, risk, communicated information, past performance factors (experience), presumed or known life hazards, predicated building or system performance, crew KSA sets or other factors, etc? Does naturalistic or RPDM decision-making influence; is the deployment tactically driven or predisposed by SOP, SOG or personal attributes and biases? Safety Conscious or aggressively driven? You get the picture…..

Try to distill them down to three or four mission critical key issues (if you can). This is a great exercise to see what everyone else considers the key factors to be or should be when deploying and  going into operations; sometimes it’s more complex than just “pulling the line” or getting in….

Take the time to use some critical thinking and don’t be subjective….think about the responses and ask why?

USFA Releases Restaurant Building Fires Report

No comments

Three Alarm Fire Renton, WA 2007 KOMONews.com

The Federal Emergency Management Agency’s (FEMA) United States Fire Administration (USFA) has issued a special report examining the characteristics of restaurant building fires.

The report, Restaurant Building Fires, was developed by USFA’s National Fire Data Center and is based on 2007 to 2009 data from the National Fire Incident Reporting System (NFIRS).

PDF, 829 KbRestaurant Building Fires     http://www.usfa.dhs.gov/downloads/pdf/statistics/v12i1.pdf

According to the report:

  • An estimated 5,900 restaurant building fires occur annually in the United States, resulting in an estimated average of 75 injuries and $172 million in property loss.
  • The leading cause of all restaurant building fires is cooking at 59 percent and nearly all of these cooking fires (91 percent) are small, confined fires with limited damage.
  • While cooking is the leading cause of all restaurant building fires as well as the smaller, confined restaurant building fires, electrical malfunction is the leading cause of the larger, nonconfined restaurant building fires.
  • Nonconfined restaurant building fires most often start in cooking areas and kitchens (41 percent).
  • Deep fryers (9 percent), ranges (7 percent), and miscellaneous kitchen and cooking equipment (5 percent) are the leading types of equipment involved in ignition in nonconfined restaurant building fires.
  • Smoke alarms were reported as present in 44 percent of nonconfined restaurant building fires. In addition, full or partial automatic extinguishment systems, mainly sprinklers, were present in 47 percent of nonconfined restaurant building fires.

Loss Measures

Time of Alarm

 Restaurant Building Fires is part of the Topical Fire Report Series. Topical reports explore facets of the U.S. fire problem as depicted through data collected in NFIRS.

Each topical report briefly addresses the nature of the specific fire or fire-related topic, highlights important findings from the data, and may suggest other resources to consider for further information. Also included are recent examples of fire incidents that demonstrate some of the issues addressed in the report or that put the report topic in context.

Additional Insights and Links

  • NIOSH REPORT:  Restaurant Fire Claims the Life of Two Career Fire Fighters – Texas, 2000 HERE

Operational Safety Recommendations

NIOSH investigators concluded that, to minimize the risk of similar incidents, fire departments should

  • ensure that the department’s Standard Operating Procedures (SOPs) are followed
  • ensure that fire command always maintains close accountability for all personnel at the fire scene
  • ensure that Incident Command conducts an initial size-up of the incident before initiating fire fighting efforts and continually evaluates the risk versus gain during operations at an incident
  •  ensure that vertical ventilation takes place to release any heat, smoke, and fire
  • ensure that fire fighters are trained to identify truss roof systems
  • ensure that fire fighters use extreme caution when operating on or under a lightweight truss roof and should develop standard operating procedures for buildings constructed with lightweight roof trusses
  • ensure that fire fighters performing fire fighting operations under or above trusses are evacuated as soon as it is determined that the trusses are exposed to fire
  • explore using a thermal imaging camera as a part of the exterior size-up
  • ensure that, whenever there is a change in personnel, all personnel are briefed and understand the procedures and operations required for that shift, station, or duty
  • ensure that, whenever a building is known to be on fire and is occupied, all exits are forced and blocked open
  • consider providing all fire fighters with portable radios or radios integrated into their face pieces
  • consider adding additional staff in accordance with NFPA standards
  • establish various written standard operating procedures, ensure record keeping, and conduct annual evaluations to monitor and evaluate the effectiveness of their overall SCBA maintenance program.

 Additionally, building owners, utility providers, and municipalities should

  • ensure that all exterior building utilities are accessible and in working condition
  • consider placing the building’s construction information on an exterior placard
  • upgrade or modify older structures to incorporate new codes and standards to improve occupancy and fire fighter safety

 

Training & Tactics Talk: Emerging Dynamics in the Modern Fire Environment Podcast

No comments

Radio@Firehouse.com

Podcasts and Internet Broadcasts for Fire and Emergency Service Professionals: Real Issues. Real Answers. Real Firefighters.

Training & Tactics Talk Hosted by Chief Doug Cline

Training & Tactics Talk: Emerging Dynamics in the Modern Fire Environment

Joining Training and Tactics Talk host Douglas Cline as he talks with his guests from across the United States about the emerging dynamics of the modern fire service environment.

Guests this month include retired Battalion Chief Dave Dodson from Denver, CO; Lt. Rick Mosher from Merriam, KS;  Christopher Naum, Chief of Training of the Command Institute; and Assistant Chief Deron Wilson of Johns Creek, GA.

The group examines several dimensions of the modern fire service as it relates to tomorrow’s fire service. The explore the art of reading smoke, the new rules of tactical combat fire engagement, multi-dimensional aspects of training and how to develop the true understanding of situational awareness.

We invite you to grab a cup of coffee or a cold drink, pull up a chair or take a seat on the tailboard and enjoy the program. Sit back, relax and let’s talk Training and Tactics.

  • Link to the Program HERE

Reference Links:

Twenty Eleven (2011); Where are you going?

No comments
What’s your world going to be in 2011?

As I was preparing my New Year’s message for 2011 I ran across my posting from Commandsafety.com that I had posted at the start of 2010. After looking it over, I got to thinking about what I had set out to accomplish this past year; what did I intend to do; what did I accomplish, what difference did I make-if any in what I worked at in 2010; did I give back to the fire service, did I support, promote and advocate, did I learn, grow and better myself, did  the year have meaning?

I wondered how many line items from this 2010 list did any of my readers hit the mark on, or was this list laidd by the way side, forgotten; but certainly attempted-with good faith. I started putting another list of what needed to be addressed in 2011, but I kept coming back to common themes and similar important issues affecting the fire service as reflected in the previous list. It became readily apparent that this is THE list, with some minor additions and updates. So instead of developing a “new” list, here is the “new” list of “old” issues-that are just as important in twenty eleven.

Take a minute to look it over, think about whateach of  these line items can do for you, your organization and the fire service in 2011.  Don’t sacrifice or forego on these mission critical areas when so much is at stake in the domain of combat structural fire suppression. Understand the predictability of performance in the buildings and occupancies not only in your jurisdiction, first or second-due areas, but also in those areas that you may be called upon to respond to for greater alarms or mutual aid. Remember Building Knowledge = Firefighter Safety.

Twenty  Eleven (2011)

Here are twenty-one  (21) Suggested activities or initiatives for you to consider in 2011….

Above all, be safe in all your endeavors, assignments and incident tasks.

  1. Regardless of my years of experience, I will increase my understanding of the basic principles of Building Construction, because; Building Knowledge=Firefighter Safety.
  2. Identify eleven  (11) buildings within your first-due or response district and complete a pre-fire plan and present this to my company of organization.
  3. Identify an area where new residential construction is underway and follow the construction process from foundation through completion to gain an understanding of operational issues.
  4. I will complete the UL Structural stability of engineered lumber in fire conditions online course  AND the new UL Fire Behavior course and implement the lessons learned in my strategic and tactical operations.
  5. I will not take any building or occupancy for granted, and shall take all precautions to ensure crew integrity and safety during my task assignments.
  6. Complete a 360 assessment of all buildings upon arrival (or delegate), when ever feasible to gain reconnaissance information on the building and incident risks and implement this info into my strategic, tactical plans or company task assignments.
  7. Research the issues affecting; Engineered Structural Systems (ESS), Fire Behavior/Fire Dynamics or Fire Suppression Management/Fire Loading and develop a training drill to share the lessons learned.
  8. Select a new or previous published fire service text book and read up on a subject area that I may have neglected or ignored to increase my skill set.
  9. Implement an objective approach towards effective risk assessment and profiling of all buildings and occupancies during incident operations and implement balanced tactical deployment with aggressive/measured assignments; recognizing that my company and I are not invincible.
  10. During demanding Combat Structural Fire Engagements, I will; Do the Right Thing at the Right Time for the Right Reasons and will not practice Tactical Entertainment.
  11. Read the Report of the Week (ROTW) on the National Firefighter Near-Miss Reporting System web site and share the operating experience (OE) lessons with my company or department, to reduce the likelihood of a similar or more serious event.
  12. I will read Eleven  (11) NIOSH Firefighter Fatality Investigation and Prevention Program Reports and present the lessons learned in a discussion, table top, drill or training program.
  13. I will attend a regional or national training conference to increase my perspective and awareness of other firefighting, safety or operational methodologies, process or practices to increase firefighter safety in my home organization.
  14. I will increase my understanding of the NFFF Everyone Goes Home Program initiatives, including the Sixteen Firefighter Life Safety Initiatives, Safety Thru Leadership and the Courage to Be Safe Programs and other new program initiatives and advocate and promote enhanced safety measures in my organization.
  15. I will advocate and promote safe and defensive apparatus operations during emergency responses and will always buckle-up my seat belt and ensure my crew is always belted-in, not placing my company at risk and obeying traffic signals and postings.
  16. I will implement the New Rules of Engagement during combat structural fire operations; while monitoring and reacting to on-going building performance and fire behavior.
  17. I will increase my understanding of the Predictability of Building Performance and base my operational deployments on Occupancy Risk not Occupancy Type.
  18. I will become a mentor to a new or less experienced firefighter and promote the traditions, honor and duty of our fire service profession, tempered with an emphasis on firefighter safety, survival and wellness.
  19. I will take NO emergency incident responses as being routine in nature, due to frequency , regularity or  past performance, demands or outcomes, nor will I take any building for granted; Company, Team and personal safety and integrity is paramount and I will not be complacent, but remain vigilant based upon my training, skills and experience.
  20. I will be an aggressive firefighter; operating smarter, working within the parameters of my Department’s protocols, regulations and expectations while employing Tactical Patience and NOT underestimate the fireground
  21. I will not settle for status quo; but strive to achieve my highest potential as a firefighter, company officer or commander; and remember I am a brother/sister (firefighter) to everyone in this great profession

Ensure you’re glancing occasionally in your rear view mirror to monitor where you’ve been, while driving your initiatives, programs, processes and actions forward. Above all, maintain the courage to be safe.

Keep an eye in the rear view mirror; learning from the wisdom and knowledge from where you’ve been, what you’ve done and all your past experiences and practice; but at the same time focusing on the road before you with keen attentiveness on situational awareness, anticipating error-likely conditions and balanced risk assessment and operational management in both your strategic and tactical deployments.

First-Due Arriving Companies; Are You Prepared?

No comments

As the First-Due Fire Company; Officer and crew, Are you prepared to address the fireground variables and occupancy risks upon your arrival and during the initial stages of your deployment and operations? Are you combat ready or passively engaged?  

It seems we’ve struck some interests over past week since we first discussed the First-Due Fire Officer  on the most recent edition of Taking it to the StreetsTM where we had a vibrant and insightful program in which we discussion some of the expansive facets related to the First-Due Fire Officer.     

 The First-Due Fire Office program can be downloaded HERE at Firefighter Netcast.com   

The formulative discussion revolved around a variety of functional elements, traits, responsibilities and duties befalling the First-Due Officer, and was followed up with a post here on Thecompanyoffer.com. We discussed how today’s First-Due Officer must perform smarter with increased perceptions, discernments and acumens with intelligence and wisdom that is drawn from further progressing and collective fire ground response and operational experiences.   

My good friend Captain Willie Wines (aka The Iron Fireman) posted a great follow-up article associated with the radio program on his blog associated with further interpretations of the First-Due Officer. Check out “The First-Due Officer; What are you thinking?”  HERE.   

To further our dialog on the first-due, I’ve added a few series of video clips and images with related links to promote and stimulate your view of the first-due fireground scene as it relates to the variables and personnel perceptions; the need for diligence and cognitive situational awareness and risk assessment and being truly “prepared” both mentally and physically. By way of physically, I mean- is your gear and PPE, functional, operational and adequately in-place?   

  As you can see there are numerous instances where the difference in the incident outcome correlated to the level of PPE protection that was in-place and implemented at the time of adverse conditions or unexpected or unforeseen circumstances.   

 Here’s today’s situations to think about at the station, around the kitchen table, over a cup of coffee in the day room after your next alarm or tonight at the station for a “back step” company drill.    

  • What are the Adverse Conditions that might be encounted upon arrival as the First-Due?
  • Flashover, Backdraft, Compromised or degraded Structural Conditions, Collapsed Conditions, Structural Collapse, Wind Drive Fire Behavior, Extreme Fire Behavior, Pre-Flashover/ Post-Flashover….
  • How Effective are you in Reading the Smoke?
  • How About Reading the Building? Do you understand Occupancy Profiling and Occupancy Risk?
  • Are you Taking the Time to Read the Subtle or Pronounced Fireground Indicators.; Comprehend their meaning or are you just “too engaged in the tactic or task?”
  • Do you have an appreciation for Tactical Patience?
  • Are your operations Tactically Driven by SOP’s and SOGs?
  • What Rules of Engagment are you considering?
  • Have and IAP in mind?
 YouTube Preview Image   

 There have been a lot of articles and postings on adverse conditions as companies are opening up or pushing into the structure on the initial entry. Take a look at the next two series of video clips related to flashover conditions and the impact of that fire behavior on the companies and personnel. In each instance companies were extremely fortunate that the injuries sustained were not more severe than encountered.  

  • What encounters have you or your company experienced?
  • In retrospect how effective was the initial risk assessment and occupancy profile-was the size-up appropriate or were key indicators missed or neglected?
  • Did the fast pace of the initial arrival and subsequent deployment filter or obscure mission critical indicators that should have been identified and acted upon?  
  • Did the tactical assignment and task overshadow tactical patience?
  • Did someone or everyone miss reading the smoke, fire or occupancy risk?
  • Did other tactical assignments contribute toward the unexpected or adverse conditions encountered, such as ventilation induced flashover? ( More on that topic for a later post; See Taking it the Streets November 4, 2010 show

          

Firefighter Will Gregory exits the home with his PPE on fire. Photo by Brian Haney, The Daily Record.

There are a series of photos  from a previous posting at STATter911 HERE that depicts firefighers working to push-in on a fire in a small residential occupancy. The ensuing flashover ignites the PPE of one firefighter. Look at the series of photographs and  take note of the fire and smoke conditions, the size and profile of the occupancy ( remember it’s Occupancy RISK not Occupancy Type).   

  • Think about the sequencing of your initial operations.
  • Think about the mission critical 360;
  • how does that play into your initial incident actions plan (IAP)?

   

The Dynamics of the Fireground in Seconds

Companies were dispatched for an assignment for a house fire. Both E807 and TK807 responded with crews of 4 personnel each. E813 arrived on the scene and reported light smoke showing on side Alpha. Upon arrival on the scene, the crew from TK807 (four staff) made entry to the house. The following series of events led to conditions in the house that presented a flashover environment. The hose line from E813 burst, a backup line was not charged due to no established water supply, and the house was not yet ventilated. Without the protection of a hose line, the crew was committed to the house when the room flashed. One firefighter was apparently far enough in the house to avoid any injury, A second FF received 2nd degree burns to his right shoulder, and a third FF received the full force of the flashover suffering second-third degree burns to his face, hands, and the majority of his torso. (Original incident information posted at the time of the event)   

  •  Photo 1: Firefighters don PPE and SCBA with light smoke visible in this first of four pictures shot by Tony George of PGFD Station 813  
  •  Photo 2: Six seconds later a small amount of fire and darker smoke can be seen at the sliding glass door. 
  •  Photo3: Forty-eight seconds after the initial picture, more fire and darker smoke are apparent. 
  •  Photo 4: Exactly two-minutes after the first picture was shot, flashover occurs with firefighters inside. 

For a complete narrative and futher incident details of this previous STATter911 postings related to this event go HERE, and HERE  

Take a good look at the performance of PPE when utilized and implemented correctly…. 

Don’t ever underestimate the dynamics and uncertainty of the evolving fireground during your operations. The video clip here depicts how quickly operations can change from an investigation to a major mass casualty incident.

For a comprehensive look at this event go here are two links for you to visit, HERE at Commandsafety.com and the NIOSH Report HERE

     

Be prepared for the unexpected and always use extreme caution and heightened situational awareness and fluid risk assessment and reconnaissance processing to stay atop of any undefined and evolving incident. Do not allow the potential lack of severity; of what may have all the indications of an unremarkable/uneventful and common call run such as a gas odor investigation or a natural gas leak cause your companies to have less than a high level of alert, focus and attentive accretions through all phases and deployments of the incident. Don’t become complacent.

In addition, take a look at some information relate to another tragic incident response to a reported gas leak that occurred in December, 1983 that lead to five fire fighter LODD’s in Buffalo, New York. HERE 

  • Archived Report From STATter911, from May, 2009 HERE and recent 2010 update HERE with fireground Audio
  • Prince George’s County (MD) Fire Press Release from May 7, 2009, HERE
  • Slide Show from WUSA9.com HERE 
  • BING mapping Images, HERE

  Here’s a series of Reports worth your time to read related to the First-Due:

  • City of Charleston Post Incident Assessment and Review Team Phase I Report, HERE
  • Routley Final Phase II Report HERE
  • NIOSH Investigative Report, HERE
  • Fire Fighting Tactics Under Wind Driven Conditions Report, HERE
  • Reference Data HERE
  • The report is also available for download at the NIST, HERE
  • Synopsis HERE
  • Report: Trends in Firefighter Fatalities Due to Structural Collapse1979-2002
  • Colerain Township (OH) Fire and EMS Department Final Report Investigation Analysis of the Squirrels Nest Lane Firefighter Line of Duty Deaths Incident Overview, HERE; NIOSH Report, HERE; Investigative Report, HERE
  • Learning the Lessons from the Past

    2 comments

    Today is June 17th, to many of you, today is unlike so many other days. Whether it’s going on or off-shift, going to your “day” job; common rituals and activities define our day and are a part of your typical schedule or routine, activities, occupation, trade, leisure or everyday jobs. On any given day, we expect some fairly simple and basic things; Simple and basic from a firefighter’s perspective that is. Let’s clearly put this discussion into firefighter terms and context. We hope that we have a busy day, for the most part; that the alarms and incidents allow us to practice our skills and do what we do best. Deep down inside, we also hope that we have a good “job” come in that allows us to work the job, to fight the fight and put into practice all that we train and prepare to do, we the bell hits and we are called to duty.

    Not that we hope or wish undue miss-fortune, distress or sorrow on anyone, but, IF a fire is going to happen, let it happen on my shift, my tour or while I’m at the firehouse and able to make the first-due. It’s a pretty fundamental hierarchy of need, and it’s what makes us tick at times. Because of who we are and what we do. Right?

    But today is much more than that. June 17th marks the anniversary of two significant fire service incidents that resonate with the values, doctrine and philosophy that define the principles and tradition of the Fire Service.

    Both of these incidents resulted in firefighter line-of-duty deaths at seemingly routine fires, in relatively ordinary structures and occupancies, each with unusual building construction features and conditions that would contribute to the adverse circumstances of the incident operations, and ultimately contribute to the LODD events.

    Hotel Vendome Fire-1972
    On June 17th, 1972, a typical routine day was unfolding for the Jakes in the Boston Fire Department. At 14:35 hours, Box 1571 was received at Boston Fire Alarm Office. It would be the first of four alarms required to extinguish an intense fire at the former Hotel Vendome on Commonwealth Avenue at Dartmouth Street, City of Boston, Massachusetts. It took nearly three hours to contain the blaze. The four alarm fire required a compliment of 16 engine companies, 5 ladder companies, 2 aerial towers and 1 heavy rescue company, with all companies operating with a full complement of personnel staffing.

    Following extensive and strenuous suppression operations, the BFD commenced routine overhaul operation. Then, at 17:28 hours, without warning, all five floors of a 40 by 45 foot section southeast corner of the building collapsed, burying a ladder truck and 17 firefighters beneath a two-story pile of brick, mortar, plaster, wood and debris.

    More than any other event in the three hundred year history of the Boston Fire Department, the Vendome tragedy exemplifies the risk intrinsic to the firefighting profession and the accompanying courage required in the performance of duty. Nine firefighters were killed on that day, eight more injured; eight women widowed, twenty-five children lost their fathers; a shocked city mourned before the sympathetic eyes of the entire nation.

    The Hotel Vendome fire and the Nine Line-of-duty deaths, two Company Officers and seven firefighters
    • Lieutenant THOMAS J. CARROLL, E-32.
    • Lieutenant JOHN E. HANBURY, JR., L-13.
    • Firefighter THOMAS W. BECKWITH, E-32.
    • Firefighter JOSEPH E. BOUCHER, JR., E-22.
    • Firefighter CHARLES E. DOLAN, L-13.
    • Firefighter JOHN E. JAMESON, E-22.
    • Firefighter RICHARD B. MAGEE, E-33.
    • Firefighter PAUL J. MURPHY, E-32.
    • Firefighter JOSEPH P. SANIUK, L-13.

    Built in 1871 and massively expanded in 1881, the Hotel Vendome was a luxury hotel located in Boston’s Back Bay, just north of Copley Square. During the 1960s, the Vendome suffered four small fires. In 1971, the year of the original building’s centennial, the Vendome was purchased. The new owners opened a restaurant called Cafe Vendome on the first floor, and began renovating the remaining hotel into condominiums and a shopping mall.

    Although the cause of the original fire was not known, the subsequent collapse was attributed to the failure of an overloaded seven-inch steel column whose support had been weakened when a new duct had been cut beneath it, exacerbated by the extra weight of water used to fight the fire on the upper floors.

    References and Documents
    • Boston Fire Department, HERE
    • Vendome, Wikipedia, HERE
    • Building Photos and the Firefighter’s Memorial, HERE
    • Gendisasters, Historical Perspective, HERE
    • Boston Globe, HERE
    • Boston FD Ladder 15, HERE

    FDNY Father’s Day Fire-2001
    The relative calm of a quiet Sunday, Father’s Day, June 17th , 2001 was broken at 14:19 hours with a phone call to the FDNY Queens Central Office reporting a fire at 12-22 Astoria Blvd, in the Astoria Section of Queens, New York. For almost 80 years, the Long Island General Supply store has been a fixture in the Long Island City section of Queens serving local contractors and residents with all of their hardware needs. Unfortunately, that included propane tanks and other flammable liquids.

    Two structures were involved in this incident. Both buildings were interconnected on the first floors as well as the cellars.

    • Both structures were built prior to 1930 of ordinary (Type III) construction, and were two stories in height, each with a full cellar.
    • Building 1 measured 2035 square feet and was triangular in shape.
    • Building 2 measured 1102 square feet and was rectangular in shape.
    • Building 1 and Building 2 shared a common or party wall and were interconnected on the first floor and the cellar.Building to building access in the cellar was through a fire door. The fire door was blocked open to allow free movement between the cellars which were used for storage. The hardware stored occupied the first floor and cellars of both buildings. Building 1 had two apartments on the second floor.

    Building 2 had an office and storage space on the second floor. Note: A third uninvolved building was attached to the west side of Building 2. The flat roof system sheathing consisted of 5/8-inch plywood covered by felt paper and rubber roof membrane. The foundation was constructed out of stone and mortar. The support system was a combination of steel masonry posts/lolly columns and wooden support beams.

    FDNY Units arrived within 5 minutes of the dispatch and gave the signal for a working fire. Fire fighters were making good progress but at 14:48 hours something went terribly wrong. Witnesses on the scene report hearing a small explosion followed by a huge blast. The shock wave from the blast blew d
    own every fire fighter on the street and knocked down the exposure 1 wall onto the sidewalk, right on top of fire fighters venting the building.

    As members started sifting through the rubble, the chief ordered a second alarm followed almost immediately by a fourth alarm when a radio transmission was received from FF Brian Fahey from Rescue 4. He was in the basement under tons of collapsed material.

    “I’m trapped in the basement by the stairs. Come get me.” This was a battle cry to everyone on the scene. Every capable member frantically began removing debris to try and get to Brian and the others. The chief ordered more help. Numerous special calls were made.

    There were 144 pieces of apparatus at the scene: 46 engines, 33 ladders, 16 battalion chiefs, 2 deputy chiefs, all 5 rescues, 7 squads, and many more. In fact, with the exception of the fire boats, the JFK hose wagon, the Decon unit, and the thawing units, every type of special unit was at the scene.

    Even with the vast resources of the Department, the task took several hours. The members that were on the sidewalk were quickly recovered.
    • Fire fighters Harry Ford (R4) and John Downing (L163) were removed in traumatic arrest and brought to Elmhurst Hospital were they succumbed from their injuries.
    • Back at the scene members still were trying to get to Brian while others were trying to put out the smoky fire. The battle went through the afternoon and into the evening.
    • The fire was being fueled by some of the flammables in the building.
    • After about four hours they finally reached the basement, but again, it was too late. FDNY Firefighter Brian died in the Line-of-duty.

    Subsequent investigations revealed that two local kids were in the rear yard of the building when unbeknownst to them they knocked over a can of gasoline. The gasoline ran under the rear door, into the basement eventually finding an ignition source in the form of the water heater.

    When the water heater kicked in, it ignited the gasoline. As fire fighters began working in the building the fire caused the explosion of a large propane tank illegally stored in the basement. The resulting blast leveled the building and caused what will be forever known as the worst Father’s Day in FDNY’s history. (Excerpt of the event description published in www.fdnewyork.com).

    The supreme sacrifice was made that day by;
    • FDNY Firefighter Harry S. Ford, Rescue Co.4
    • FDNY Firefighter Brain D. Fahey, Rescue Co. 4
    • FDNY Firefighter John Downing, Ladder Co. 163

    Take the time to read the NIOSH Report, and learn the lessons from that event

    References
    NIOSH Report F2001-23, HERE
    FDNEWYORK, HERE
    Steve Spak, Photos, HERE
    The Late, FDNY Firefighter Andy Fredrick’s Account, HERE
    Online Service Accounts and Coverage, HERE
    Buffalo, NY FD North Division Street Explosion, HERE, HERE and HERE

    Note: The Buffalo, NY, Fire Department experienced a similar event on December 27, 1983 in North Division Street Fire and Explosion that resulted in five firefighter line-of-duty deaths.

    As BFD firefighters arrived at the scene of a reported propane leak in a three-story radiator warehouse (Type III ordinary construction), a massive explosion occurred, killing five firefighters instantly and injuring nine others, three of them critically. The force of the blast blew BFD Ladder 5’s tiller aerial 35 feet across the street into the front yard of a dwelling. BFD Engine 1’s pumper was also blown across the street with the captain and driver pinned in the cab with burning debris all around them. Engine 32’s engine was blown up against a warehouse across a side street and covered with rubble.

    Two civilians were also killed and another 60 to 70 were injured. While operating at the rescue effort, another 19 firefighters were injured. The blast and ensuing fire ignited 14 residences and damaged as many as 130 buildings over a four block area. The explosion occurred when an employee was moving an illegal 500-lb. propane tank with a forklift truck and dropped it, breaking off a valve. The gas leaked out, found an ignition source, and the explosion occurred. Killed in the line of duty were all assigned to Buffalo FD Ladder Company 5; F/F Michael Austin, F/F Michael Catanzaro, F/F Matthew Colpoys, F/F James Lickfield and F/F Anthony Waszkielewicz.

    Taking it to the Streets
    The adage that the fire service has more recently adopted states; “There are no “routine calls”; referring to the safety consciousness that all responding companies should endeavor to consider when responding to an incident, that all too often appears; upon our arrival to be routine in every sense of the word. Whether it’s an alarm system activation, a report of food on the stove, a report of a smoke detector alarming or a report of a gas odor or leak, we have a tendency to treat a lot of things as equal and very routine based upon the periodicity and frequency of the alarm type and the typical, inconsequential nature of the incident outcome or the commonality of the fire and suppression efforts that routinely are employed by our operating companies.

    We seem to do a lot of things at times out of common practice and repetition, you know; “We’ve always done it that way…” syndrome. There’s a resonating theme that is making its way around the fire service dealing with an apparent “culture of extinguishment” and the suggested and inaccurately described “diametrically opposing” fire service safety culture promoted by those on the “Dark Side”

    The daily experience, expectations, our comfort zone;
    • We’re pretty good at what we do-Regularly….
    • We develop profound habits and methods…
    • We treat a lot of things as equal in many respects…
    • We’ve grown accustomed to certain operational modes..
    • We don’t really think anything is going to happen to us, certainly nothing so adverse that I don’t go home after the call.

    Nothing is going to happen to YOU; it happens to someone else….
    BUT to everyone else-YOU are the other Guy!

    On any give day, at any give alarm, the dynamics around us at times may be in or out of our direct control. We may not be able to see what the cards have in store for us, BUT we must ensure we use every fragment of training, fortitude, knowledge, skills, courage, bravery, insights, luck and sometimes (other divine) intervention to get us through.

    Take the time today or this evening to visit and download selective reports from the NIOSH Fire Fighter Fatality Investigation and Prevention Program. The lessons learned from these reports and the important recommendations that are written as a direct result of the supreme sacrifices made by our brother and sister firefighters that died in the line of duty speaks volumes. In reality, the words written in these reports are the words from our fallen, they convey the messages to correct deficiencies, close gaps and increase and enhance our operations, training, education, administration, management, supervision, resources, equipment, protocols, preparedness, perspectives, culture and values.

    When you look over these events over the years, it doesn’t take long to identify that many LODD events share similarities, and that specific incident events, deficiencies, outcomes and recommendations are identical in every way, except for the fire department name and geographical location. In other words, we have History Repeating Events (HRE). Events that resonate with common issues, apparent and contributing causes and operational factors that share legacy issues that the fire service fails to identify, relate to and implement. In other words, we fail a times to learn from the past, or we make a deliberate chose to ignore those lessons due to other internal or external influences, pressures, authority, beliefs, values or viewpoints. We make choices and we determine our direction, path and destiny.

    History repeating itself is nothing new to society, it is apparent and self revealing in much of written history and recorded legacies, and as defined by a popular quote states; “Those who cannot learn from history are doomed to repeat it.”

    An interesting series of quotes from noted historian Gerda Lerner states the following;
    “What we do about history matters. The often repeated saying that those who forget the lessons of history are doomed to repeat them has a lot of truth in it. But what are ‘the lessons of history’? The very attempt at definition furnishes ground for new conflicts. History is not a recipe book; past events are never replicated in the present in quite the same way. Historical events are infinitely variable and their interpretations are a constantly shifting process. There are no certainties to be found in the past.”

    She goes on to state; “We can learn from history how past generations thought and acted, how they responded to the demands of their time and how they solved their problems. We can learn by analogy, not by example, for our circumstances will always be different than theirs were. The main thing history can teach us is that human actions have consequences and that certain choices, once made, cannot be undone. They foreclose the possibility of making other choices and thus they determine future events.”

    We must learn for the part, so that we limit or eradicate the opportunity for History Repeating events aligning themselves again and providing emergency incident circumstances to lead to another line-of-duty death, injuries or large loss incident.

    History Repeating Events share may common and familiar themes. Research exemplifies the following shared commonality causes related to History Repeating Events;
    • A lack of pre-incident planning
    • Ineffective or lack of risk management
    • No Incident action plan• Free-lancing
    • Inadequate Training/Skills• Faulted Strategies and/or Tactics
    • Deficient Resources/staffing
    • Lack of Accountability• Insufficient Fire Suppression versus Fire Loading affect• Ineffective or non-existent Supervisory oversight
    • No effective span of control / management
    • Not understanding Building Construction
    • Not understanding Structural Assemblies and Systems
    • Not understanding Construction & Occupancy factors• Not understanding Engineered Building Systems and relationship to Tactics
    • Lacking understanding of Fire Behavior and Fire Dynamics
    • Ineffective Company level supervision
    • Lack of Situational Awareness• Command Dysfunction
    • Failure to implement periodic in-situ reassessments

    Think about your actions, think about what you can do to make a difference or to alter or change the course of a situation. We sometimes have a greater hand in destiny and how the cards are dealt than we think. Take a look and discuss the HRE causal factors listed above, share these with you officers, with you company level personnel or the department as a whole. Pose the question, “What do these mean to you?” See what the different feedback might illustrate and how they may be viewed from a different set of perspectives, generations or rank and assignments.

    Safety Considerations for Operations involving Ordinary or Heavy Timber Type Construction.
    In support of the two (2) incident events discussed in this article related to the Hotel Vendome and the Astoria Queens Hardware Store Explosion. Both of these structures were Type III, Ordinary Construction. This is a good opportunity for you to introduce yourself to or refresh yourself on the Safety Considerations for Operations involving Ordinary or Heavy Ti…

    A comprehensive power point program is available for download from the Near Miss Reporting System web site, HERE

    An accompanying narrative report and its alignment with a Near Miss Report related to a type III occupancy and incident response and close call support the power point presentation, HERE

    Don’t forget, the Near Miss Reporting System, HERE, has exemplary resources, case studies, close calls and lessons to be learned and institutionalized. The same is true about the resources at the NFFF Everyone Goes Home Program, HERE and the IAFC Fire/EMS Safety week web site HERE.

    Take the time to learn something about Ordinary or Heavy Timber Type Construction. As I continue to advocate;  Building Knowledge = Firefighter Safety. No more History Repeating Events!
    Here’s a closing quote from the late Senator Robert F. Kennedy;“Few will have the greatness to bend history itself; but each of us can work to change a small portion of events, and in the total of all those acts will be written the history of this generation.”

    Be safe, have a great tour or stay at the firehouse today or this evening.

    Orginally published during  2009 Safety Health and Survival Week.

    From Waldbaum’s to Hackensack- Worcester to Charleston; Legacies for Operational Safety

    9 comments

    6-15-2009 7-39-58 PM

    From Waldbaum’s to Hackensack- Worcester to Charleston; Legacies for Operational Safety

    “From Waldbaum’s to Hackensack- Worcester to Charleston; Legacies for Operational Safety”; I still find it surprising during my travels around the country lecturing and presenting programs on building construction, that when the audience was asked, “What do the Walbaum’s Fire and Hackensack fire share in common?”, the response typically were blank stares. The more seasoned and experienced veterans (translation; Older firefighters) when present, were able to convey some information on the subject. But yet, the true essence of the basic incident particulars and the lessons learned fail to be fully conveyed. We’re not remembering the past!

    I’ve spoken on numerous occasions about History Repeating Events (HRE), and the common themes related to LODD. Events that resonate with common issues, apparent and contributing causes and operational factors that share legacy issues that the fire service fails to identify, relate to and implement. In other words, we fail a times to learn from the past, or we make a deliberate choice to ignore those lessons due to other internal or external influences, pressures, authority, beliefs, values or viewpoints. We make choices and we determine our direction, path and destiny.

    When you look over these LODD events over the years (NIOSH, NFPA, USFA Reports), it doesn’t take long to identify that many LODD events share similarities, and that specific incident events, deficiencies, outcomes and recommendations are identical in every way, except for the fire department name and geographical location. In other words, we have History Repeating Events (HRE).

    What have we learned from the past? What is it that we’re passing down to each incoming recruit class and probationary firefighter? What are Company and Commanding Officers recalling and considering in their dynamic risk assessment, size-up and decision-making (IAP) process when looking at a particular building, occupancy and fire? Are mission critical operational elements & HRE factors being recollected? (Naturalistic/ Recognition-Prime Decision-making).

    Are the fire service legacies of the past and the lessons learned from those incidents and the sacrifices that were made transcending time? Or are they lost in the immediacy of day to day challenges, issues and operations. Or are these events, lessons and operations issues dismissed and disregarded as a result of their “time and place” not being relevant to “today’s” operations and modern fire service advancements.

    The reality is, we, the present generation of veteran firefighters and officers at times neglect or fail to recognize the importance of passing along the lessons of our life’s journey through our fire service careers, the events of our day and the profound tough lessons and sacrifices learned the hard way. We sometimes need a receptive, sympathetic and compassionate audience that is willing to listen, hear and comprehend the messages conveyed. There needs to be a high degree of empathy related to these past History Repeating Events. For each event, each and every line of duty death has a message and a Legacy of Operational Safety.

    Throughout the past thirty-three years (1977-2010), over 4,000 firefighters have lost their lives in the course and conduct of their duties as firefighters and officers within the fire service. Although there are numerous LODD fire incidents and events that could be discussed, all distinguished and exemplified by heroism, nobility, cause and fortitude. There are four that stand out when related to the lessons learned and the significance and impact each LODD incident had at the time to the national fire service.

    Each of these incidents also have significance as they relate to the building, occupancy, use, construction features, inherent structural systems, fire behavior and fire dynamics; coupled with interrelated elements of strategic and tactical fire suppression operations and incident management . Again, “Building Knowledge=Firefighter Safety”.

    The Waldbaum’s Supermarket Fire: Brooklyn, New York August 3, 1978
    Six LODD

    Six FDNY firefighters died at this fire when the wood bowstring truss roof collapsed, 34 were injured. The fire started at 8:40 hrs. in Waldbaum’s Supermarket, Ave. Y and Ocean Ave., Sheepshead Bay, Brooklyn, NY. Nearly 23 electricians, plumbers etc ., were in the process of renovating the building, while it was still open and operating when the fire started in the mezzanine area. An All hands was transmitted at 08:49 hrs. the 2nd alarm at 09:02 hrs. Shortly after 09:20 hrs., with 20 firefighters on the roof a crackling sound was heard and the center portion of the bow string trussed roof fell into the smoke and flames. A total of 12 firefighters fell into the inferno, six were rescued, six died in the line of duty.

    Honor and Remembrance
    • Lt. James Cutillo, 33rd Battalion
    • Firefighter Charles Bouton, Ladder Co. 156
    • Firefighter William O’Conner, Ladder Co. 156
    • Firefighter James P McManus, Ladder Co. 153
    • Firefighter George Rice, Ladder Co. 153
    • Firefighter Harold F. Hastings, Ladder Co.153

    Hackensack Ford: Hackensack, New Jersey July 1, 1988
    Five LODD

    Five fire fighters from the Hackensack, New Jersey Fire Department were killed in the line-of duty while they were engaged in interior fire suppression efforts at an automobile dealership when portions of the building’s wood bowstring truss roof collapsed.

    Honor and Remembrance
    • Captain Richard Williams
    • Lt. Richard Reinhogen
    • Firefighter William Krejsa
    • Firefighter Leonard Radumski
    • Firefighter Stephen Ennis

    Note: The 1988 Hackensack Ford Fire occurred almost ten years to the date of the Waldbaum’s FDNY Fire in 1978. (History Repeating Event…we forgot something along the way regarding bow string trussed roof systems and fire impingement…)

    As a result of this incident passage of a NJ State law mandating the clear demarcation of truss roofs and other structural hazards with warning signs (placards) on building with truss roofs was. In 1991 NJ State law required the State Bureau of Fire Safety to investigate all fires in which a firefighter dies or is seriously injured. See National Truss Placarding.

    The Worcester Cold Storage and Warehouse Fire: Worcester, Massachusetts, December 3, 1999
    Six LODD

    On December 3, 1999, the vacant, six-story Worcester Cold Storage and Warehouse Co. building in Worcester, Massachusetts, was set ablaze by two homeless people knocking a lighted candle into a pile of ragged clothes. The Worcester Fire Department responded at 6:13 p.m. to Box Alarm 1438. The Rescue 1 team of Firefighter Paul Brotherton and Firefighter Jerry Lucey entered the building searching for occupants. Fire conditions worsened in the building at an alarmingly unexpected rate. Paul and Jerry, on the fifth floor, became disoriented in the smoke-filled building. Lost, and running low on air, they called for help. Several teams began searching for the lost fire fighters.

    Two teams reaching the fifth floor also found themselves disoriented in the smoke and trapped by the maze of interior walls — Lieutenant Tom Spencer and Firefighter Tim Jackson from Ladder 2, and Firefighter Jay Lyons and Firefighter Joe McGuirk from Engine 3. Though many more brave fire fighters attempted to locate their missing brothers, their efforts proved futile. Their deaths marked the worst loss of fire fighters’ lives in more than 20 years in a building fire in America, and the third worst fire in Massachusetts’ history. Six days after they died, a memorial service drew 30,000 fire fighters and 10,000 civilians in what was believed to have been the largest such service for fire fighters killed on duty.

    Honor and Remembrance
    • Firefighter Paul A Brotherton, Rescue Co.1
    • Firefighter Timothy P. Jackson, Ladder Co.2
    • Firefighter Jeremiah M. Lucey, Rescue Co.1
    • Firefighter James F. “Jay” Lyons III, Engine Co. 3
    • Firefighter Joseph T. McGuirk , Engine Co. 3
    • Lt. Thomas E. Spencer, Ladder Co.2

    Sofa Superstore Fire: Charleston, South Carolina, June 18, 2007
    Nine LODD

    On the evening of June 18, 2007, units from the Charleston Fire Department responded to a fire at the Sofa Super Store, a large retail furniture outlet in the West Ashley district of the city. Within less than 40 minutes, the fire claimed the lives of nine firefighters. The highly flammable characteristics of the materials that were stored in the loading dock and throughout the premises provided an ample supply of fuel and caused the fire to spread rapidly, affecting the building’s structural integrity and adversely affecting manual fire suppression activities.

    Honor and Remembrance
    • Bradford Rodney “Brad” Baity – Engineer 19
    • Theodore Michael Benke – Captain 16
    • Melvin Edward Champaign – Firefighter 16
    • James “Earl” Allen Drayton – Firefighter 19
    • Michael Jonathon Alan French – Engineer 5
    • William H. “Billy” Hutchinson, III – Captain 19
    • Mark Wesley Kelsey – Captain 5
    • Louis Mark Mulkey – Captain 15
    • Brandon Kenyon Thompson – Firefighter 5

    Commemorate and Remembrance
    On the evening of June 18, 2007, units from the Charleston Fire Department responded to a fire at the Sofa Super Store, a large retail furniture outlet in the West Ashley district of the city. Within less than 40 minutes, the fire claimed the lives of nine firefighters.

    The Executive Summary of the FIREFIGHTER FATALITY INVESTIGATIVE REPORT Sofa Super Store Fire, Phase II Report issued MAY 15, 2008 provided critical insights into the apparent and contributing causes that culminated in the event. The Sofa Super Store was a large property that incorporated a very significant potential for a major fire to occur. It’s appropriate at this time to revisit those key factors described within the report in order for provide the opportunity for departments or agencies to recognize or identify similar gaps that exist, and take the necessary corrective actions. These gaps may be precursors to potentially significant or serious future events and extend in operational, training, administrative, managerial, construction, prevention and regulatory and codes.

    • The fire risk factors associated with the Sofa Super Store exceeded the limits prescribed by the applicable building and fire codes. An automatic sprinkler system should have been installed to reduce the level of fire risk or the buildings should have been divided into manageable fire compartments by a system of fire walls.
    • If a sprinkler system had been installed, the fire probably would likely have been controlled within the loading dock area.
    • If effective fire walls had been provided, the fire probably would not have spread beyond the loading dock.
    • The highly flammable characteristics of the materials that were stored in the loading dock and throughout the premises provided an ample supply of fuel and caused the fire to spread rapidly. The burning contents released copious quantities of heat and toxic smoke.
    • Significant quantities of flammable and combustible liquids that were stored in the loading dock likely contributed to the severity and rapid spread of the fire.
    • The fire had extended to the loading dock when firefighters arrived.
    • Charleston Fire Department members attempted to fight the fire by initiating an offensive interior attack into the loading dock.
    • The offensive attack was launched from two directions. One attack line entered the loading dock from the exterior, while a second line was stretched through the showrooms and into the loading dock.
    • The offensive attack failed to control the fire. The fire extended into adjoining areas on three sides of the loading dock.
    • At least 16 firefighters, who were operating deep inside the showrooms, became enveloped in heavy smoke.
    • Conditions inside the showrooms became critical as the fire began to involve this part of the building. Several firefighters became disoriented and were running short of air. Radio messages requesting assistance were not heard.
    • Seven firefighters managed to find their way out of the showrooms. The nine deceased firefighters were unable to find their way out as the fire spread rapidly from the rear of the building to the front.
    • The size and layout of the building, inadequate exits, and the highly flammable nature of the contents likely contributed to the inability of the lost firefighters to escape from the building. Rescue efforts were attempted when the situation inside the showrooms was recognized. In spite of valiant efforts, it was too late to save the missing firefighters before the store became fully involved in flames.

    The analysis of operations conducted by the Charleston Fire Department includes the following observations and findings:

    • Fire fighting operations at the Sofa Super Store did not comply with Federal occupational safety and health regulations, recommended safety standards, or accepted fire service practices.
    • The Charleston Fire Department failed to provide adequate direction, supervision, and coordination over the operations that were conducted.
    • The documented duties and responsibilities of an Incident Commander were not performed and risk management guidelines were not adequately applied to the situation.
    • The culture of the Charleston Fire Department promoted aggressive offensive tactics that exposed firefighters to excessive and avoidable risks and failed to apply basic firefighter safety practices.
    • Insufficient training, inadequate staffing, obsolete equipment and outdated tactics all contributed to an ineffective effort to control the fire with offensive tactics during the early stages of the incident.
    • The Charleston Fire Department continued to apply offensive tactics after the situation had evolved to a point where risk management guidelines called for defensive strategy.
    • Factors that should have caused firefighters to be removed from interior tactical (offensive) positions were not recognized.
    • There was a lack of accountability for the location and function of firefighters who were operating inside the building. The Charleston Fire Department did not have appropriate Mayday procedures to be followed by firefighters in distress, for dispatchers, or for command officers on the scene.

    All of the listed factors and many others were analyzed and discussed in detail within the body of the issued report. If you haven’t found the time or reason to read the report, do so; it would make for a good task activity for Safety Week. The report document presented the dedicated and conscientious efforts of the review team to honor the nine fallen firefighters by making every possible effort to learn from their sacrifice. The operative question is this; “What factors or attributes are comparable to situations or conditions that presently exist within your Department, Organization or community? What are you going to proactively do to address these issues or conditions in a timely manner?

    Understanding the Building Profile and Risk
    The Sofa Super Store occupied a complex of interconnected structures that had been constructed in several phases. The showroom building, facing Savannah Highway, was actually an assembly of three separate structures. The front wall was a façade, with a parapet extending above the roof line, creating the appearance of one large building when viewed from Savannah Highway. (Refer to the Report for diagrams, plans and photographs)
    • The front wall, including the parapet, was approximately 23 feet tall, while the roof behind the parapet varied from 12 to 14 feet above grade.
    • The main showroom was originally constructed as a grocery store, probably during the 1950s or 60s. The original building was approximately 125 feet in width and 130 feet deep, with a rectangular extension in the southwest corner (right-rear facing the building from Savannah Highway).
    • The front wall was brick construction with large storefront windows, while the side and rear walls were constructed of concrete block.
    • The original structure had a flat metal deck roof, supported by lightweight steel bar joists (trusses), spanning from east to west across the store. The side walls supported the ends of the bar joists, while two rows of steel beams and columns provided intermediate support.
    • A suspended ceiling was installed below the roof trusses.

    After the property was converted to a furniture store, two pre-engineered metal buildings were added-on to the original structure to expand the showroom area. Each showroom addition was approximately 60 feet in width and 120 feet deep. The first showroom addition was constructed on the west side of the original building in 1994 and the second was added on the east side in 1995. (The add-on structures are referred to as the east and west showrooms in this report, while the original structure is identified as the main showroom.) Six large openings in the concrete block side walls, three on each side of the original building, provided connections between the showroom areas; their combined floor area was in excess of 31,000 square feet. An additional pre-engineered metal structure was erected at the rear of the property in 1996 to serve as a warehouse. This structure was approximately 120 feet wide by 130 feet deep and 29 feet tall. Furniture was stored on steel racks, 20 feet in height, inside the warehouse.

    Going Forward: The Structural Anatomy of Building Construction
    The following are quotes from Fire Chief Anthony Aiellos (ret) Hackensack (NJ) Fire Department
    Fire Chief during the Hackensack Ford Fire, July, 1988

    “If you don’t fully understand how a building truly performs or reacts under fire conditions and the variables that can influence its stability and degradation, movement of fire and products of combustion and the resource requirements for fire suppression in terms of staffing, apparatus and required fire flows, then you will be functioning and operating in a reactionary manner.”

    “This places higher risk to your personnel and lessens the likelihood for effective, efficient and safe operations. You’re just not doing your job effectively and you’re at RISK. These risks can equate into insurmountable operational challenges and could lead to adverse incident outcomes. Someone could get hurt, someone could die, it’s that simple, it’s that obvious”.

    Risk Based Response Assignments
    The buildings, structures and occupancies that comprise typical response districts pose unique and consistent challenges during structural fire attack. The variety of occupancies and building characteristics establish varying degrees of risk potential, with defined and recognizable strategic and tactical measures to be taken-sometimes uniquely to each occupancy type. Although each occupancy type presents variables that dictate how a particular incident is handled, most company operations evolve from basic principles rooted in past performance and operations at similar structures. This is based on what I define as; “predictability of performance.”

    When we look at various buildings and occupancies, past operational experiences; those that were successful, and those that were not, give us experiences that define and determine how we access, react and expect similar structures and occupancies to perform at a given alarm in the future. Naturalistic (or recognition-primed) decision-making forms much of this basis. We predicate certain expectations that fire will travel in a defined (predictable) manner that fire will hold within a room and compartment for a given duration of time, that the fire load and related fire flows required will be appropriate for an expected size and severity of fire encountered within a given building, occupancy, structural system.

    We used to know with a measured degree of predictability, how our buildings would perform, react and fail under most fire conditions. This is what our years of fireground experience provided us, and how we ultimately would predict, assess, plan and implement our incident action plans and ultimately deploy our companies-based upon the predictable performance expected. Conventional Construction Structures (CCS) had this “predictably of performance.” You know, that typical residential structure, the 2-1/2 story wood frame, the three story brick and joist type III occupancy, the four story frame multiple occupancy, etc., etc. Unlike Engineered System Structures (ESS) whose predictability is rooted in the fact that they are unpredictable.

    The emerging fire service issues affecting buildings, occupancies and structural systems related to ESS is only beginning to take hold a prominent role and level of significance that is long overdue. The fire service has been dealing with the operational issues and line-of-duty deaths related to ESS since the 1980s and now in 2009, we’re finally raising these ESS issues to a dialog point that is influencing firefighter safety, survival and operations. ( Refer to the Underwriters Laboratory’s (UL) UL University on-line training module for a state-of-the art presentation on Structural Stability of Engineered Lumber in Fire Conditions and performance results that correlate towards redefining fire suppression operations)

    The fire service is beginning to fully recognize the merits in adjusting, altering, and changing our strategic and tactical ways of doing business in the streets. It’s becoming self evident in the fire service that it’s no longer acceptable to think that ESS buildings and occupancies will perform in the same manner as CCS buildings and occupancies and that tactics deployed in both CCS and ESS buildings and occupancies will react under similar strategic and tactical plans and tasks. These unique and inherent factors within the ESS profiles must give us a new standard for operational deployment; strategies and tactics that are defined by the risk profile of the building, its engineered structural systems, materials and methods of construction and the fire loading present.

    Considerations for changing fire flow rates, the sizing of hose line and the adequacies for fire flow demand and application rates, staffing needs for safe operations, considerations for defensive positioning and defensive operating postures must be considered, and it warrants repeating again; Reckless-Aggressive firefighting must be redefined in the built environment and associated with goal oriented tactical operations that are defined by risk assessed and analyzed tasks that are executed under battle plans that promote the best in safety practices and survivability within know hostile structural fire environment- with determined, effective and proactive firefighting.

    Risk-Preferring and Self-indulging Firefighting
    Don’t mistake determined, effective and proactive firefighting with that of reckless, baseless and risk-preferring and self-indulging firefighting. There is a difference, a big difference. When we address relationships of Building Construction, Command Risk Management and Fire Fighter Safety with the occupancy and structural environment, all personnel, regardless of rank, need to equate the occupancy risk with strategic and tactical incident action plans. These safely compliment the identified firefighting operation risk, with the projected building risk profile and interface appropriate behavioral characteristics in the task level firefighting activities. Again, equating building, occupancy risk profiles with determined, effective and proactive firefighting.

    The traditional attitudes and beliefs of equating aggressive firefighting operations in all occupancy types coupled with the correlating, established and pragmatic operational strategies and tactics MUST not only be questioned, they need to be adjusted and modified; risk assessment, risk-benefit analysis, safety and survivability profiling, operational value and firefighter injury and LODD reduction must be further institutionalized to become a recognized part of modern firefighting operations.

    It’s no longer just brute force and sheer physical determination that define structural fire suppression operations. Aggressive firefighting must be redefined and aligned to the built environment and associated with goal oriented tactical operations that are defined by risk assessed and analyzed tasks that are executed under battle plans that promote the best in safety practices and survivability within know hostile structural fire environments. Consider the following definitions as they relate to defining structural combat fire suppression operations.

    Aggressive and Measured Approach.
    Aggressive: Assertive, bold, and energetic, forceful, determined, confident, marked by driving forceful energy or initiative, marked by combative readiness, assured, direct, dominate…

    Measured: Calculated; deliberate, careful; restrained, think, considered, confident, alternatives, reasoned actions, in control, self assured, calm…

    You be the judge as to what should be appropriately defining interior fire suppression operations.

    It’s all about understanding the building-occupancy relationships and integrating; construction, occupancies, fire dynamics and fire behavior, risk, analysis, the art and science of firefighting, safety conscious work environment concepts and effective and well-informed incident command management. This is what it’s going to take to truly provide a means for “everyone to go home”.

    Occupancy Risk not Occupancy Type
    Many of today’s incident commanders, company officers and firefighters lack the clarity of understanding and comprehension that correlate to the inherent characteristics of today’s buildings, construction and occupancies. We assume that the redundancy of our operations and incident responses equates with predictability and diminished risk to our firefighting personnel.

    Our current generation of buildings, construction and occupancies are not as predictable as past conventional construction, therefore risk assessment, strategies and tactics must change to address these new rules of structural fire engagement. You need to gain the knowledge and insights and to change and adjust your operating profile in order to safe guard your companies, personnel and team compositions. Again strategic firefighting operations; Strategies and tactics must be based on occupancy risk not occupancy type.
    With this being stated, another primary consideration that must be deliberated and changed as it relates to firefighting and the built environment is the long held fire service tradition and practice of Structural Fire Alarm Response (resources) Assignments being based upon the Occupancy Type. Sending the two Engine Companies and one Truck Company assignment with a Battalion Chief and a RIT team to a reported structure fire in an occupied single family residential structure; is not acceptable.

    As previously stated; the rules for structural fire engagement have changed. Structural Fire Alarm Response (resources) Assignments should be based upon the Risk Profile the occupancy has related to Building construction, systems and projected or determined fire loading. Sending the four Engine Companies, two Truck Companies, a manpower Heavy Rescue Company, two additional Battalion Chiefs, a Safety Officer and support staff assignment with the assigned Battalion Chief on the alarm assignment to a reported structure fire in an occupied single family residential structure, that happens to be 5000 square feet in size with ESS components; IS Acceptable.

    • There is an acute understanding and corollary of technical knowledge and inter reliance on occupancies, construction, strategy, tactics, risk, safety, physics, engineering and fire suppression theory, This is a fact.
    • Previous, historical parameters and Building/Structural Performance always provides a postulated measurement to gauge operational tasks and form the basis for the Incident Action Plan. These parameters must be recognized and integrated
    • There is a need to integrate performance based incident indicators derived from engineering, physics, fire dynamics, historical and statistical basis
    • Basic Size-Up is Antiquated for Firefighting and the Built Environment. – Start Thinking in terms of Dynamic Risk Assessment and Command Risk Management
    • USFA Annual Report on Firefighter Fatalities in the United States; “More firefighters using an aggressive interior attack in enclosed structures die more often, in greater numbers, and with greater multiple line-of-duty deaths than those using the same tactical approach in opened structure fires.”

    Start integrating an understating of Fire Dynamics and Fire Behavior and the impact on structural integrity and operational deployment

    Situational Awareness and Risk Assessment
    Situation Awareness related to Building Construction, Command Risk Management and Firefighter Safety is another mission critical element. Situation Awareness (SA) is the perception of environmental elements within a volume of time and space, the comprehension of their meaning, and the projection of their status in the near future. It is also a field of study concerned with perception of the environment critical to decision-makers in complex, dynamic situations and incidents. Both the 2006 and 2007 Firefighter Near-Miss Reporting System Annual Reports identified a lack of situational awareness as the highest contributing factor to near misses reported.

    Situation Awareness involves being aware of what is happening around you at an incident scene to understand how information, events, and your own actions will impact operational goals and incident objectives, both now and in the near future. Lacking SA or having inadequate SA has been identified as one of the primary factors in accidents attributed to human error (Hartel, Smith, & Prince, 1991) (Nullmeyer, Stella, Montijo, & Harden, 2005). Situation Awareness becomes especially important in the structural fire suppression and firefighter domains where the information flow can be quite high and poor decisions can lead to serious consequences. Dynamic Risk Assessment is commonly used to describe a process of risk assessment being carried out in a changing or evolving environment, where what is being assessed is developing as the process itself is being undertaken. This is further problematical for the Incident Commander when confronted with competing or conflicting incident priorities, demands or distractions before a complete appreciation of all mission critical or essential information and data has been obtained. The dynamic management of risk is all about effective, informed and decisive decision making during all phases of an incident at a structural fire.

    To the Incident Commander, fire officer or firefighter, knowing what’s going on around you, in and around the building structure and understanding the consequences of building, construction, assembly, fire load and fire development and growth is mission critical to incident stabilization and mitigation and profoundly crucial in terms of personnel safety.The integration of Situational Awareness and Dynamic Risk Assessment related to the building and occupancy is a mission critical element in managing structural fires and in the strategic command management and company level tactical operations as we go forward into the next decade. Traditional phased incident scene size-up and monitoring is antiquated and no longer appropriate or applicable to modern fire service operations.Situational awareness is a combination of attitudes, previously learned knowledge and new information gained from the incident scene and environment that enables the strategic commanders, decision-makers and tactical companies to gather the information they need to make effective decisions that will keep their firefighters and resources out of harm’s way, reducing the likelihood of adverse or detrimental effects.

    Command and company officers and firefighters MUST understand the building, the occupancy features and the inherent impact of fire within and on the structure, AND be able to identify, communicate and take actions necessary to support the incident action and battle plans, mitigate incident conditions and provide for continuous safety protection to themselves, their team, their company and the entire alarm assignment operating at the incident scene.

    It’s Not about Our Entertainment Value
    When we focus our attention on the interdependent functional domains of Building Construction, Command Risk Management and Fire Fighter Safety and the essence of combat structural fires; Structural firefighting is what it’s all about, is it not? The reason we have such veneration for firefighting and the fire service and all it entails; has a lot to do with going into burning buildings and fighting fire. We enjoy it tremendously; because of who we are and what we do-as firefighters. But, firefighting has its adverse consequences, with all too familiar costs, in the form of injuries, debilitating accidents and line of duty deaths.

    As a firefighter, to say that we love firefighting would be an understatement, but one issue that we need to address is the fact that there are many individual firefighters, companies and organizations that employ fireground operational practices that promote the “enjoyment and entertainment” of working a good job within the occupancy compartment of a structural fire in the building environment.-Staying too long in the wrong place, operating tactically in an adverse environment with known hazards that does not have value, for nothing other than the enjoyment of nozzle time and operating time in the fire.

    Fire suppression tactics must be adjusted for the rapidly changing methods and materials impacting all forms of building construction, occupancies and structures. The need to redefine the art and science of firefighting is nearly upon us. Some things do stand the test of time, others need to adjust, evolve and change. Not for the sake of change only, but for the emerging and evolving buildings, structures and occupancies being built, developed or renovated in our communities.

    If the fire service can significantly increase proficiencies in building knowledge and equate that to other fundamental operational aspect in structural fire operations, then there would be a direct enhancement to firefighter safety, through injury and LODD reduction. If we understand buildings, occupancies and construction, and balance this with our understanding of fire dynamics and orchestrate it with appropriate strategies, tactics and command management, then we made the new safety equation work; Building Knowledge = Firefighter Safety (Bk=F2S). It’s all about the Structural Anatomy of Buildings.

    What do you know about Building Construction?

    No comments

    BKFFSWhat do you know about Building Construction?
    Regardless of your rank or time in your organization or company; what do YOU know about building construction? It’s a loaded question to say the least, since the characteristic replies run the gamete of what one thinks they know versus what they actually know. I had the opportunity to lecture in different regions around the country over the past four weeks doing a series of programs on building construction, command risk management and firefighter safety. I say this to frame into context the following. When discussing strategic and tactical operational issues related to combat structural fire operations in the built environment, the majority of personnel, when asked “what type of formal training or instruction have they received in the areas of building construction?”; the majority of replies was typical- NONE, or in varied instanced; a seminar, maybe a weekend field class, or what they received in recruit school. There were some who indicated they had completed a college level course or some more comprehensive single course delivery.

    At the minimum, as a company or command officer you must have a soild and fundamental understanding of building construction in order for you to safely and effectively do your job. It’s that simple, it’s that clear, it’s that important.

    This common theme is distressing on a number of levels. First and foremost, do you think that, we as firefighters when tasked with the distinctive job of fighting fires in buildings and occupancies; that we should know intimately how a building is constructed, it’s materials and methods of construction, what systems and assemblies hold it in place. How fire loading, dynamics, behavior, intensity and travel and will affect a structure in terms of impingement, propagation, compromise, integrity and collapse. A solid and well versed knowledge base on building construction is an essential and fundamental element in all operational assignments at fires involving a structure and occupancy. Do you think it is anything less?

    Knowledge and proficiencies related to building construction are formulative to all strategic, tactical and task level assignments. Without understanding the building-occupancy relationships and integrating; construction, occupancies, fire dynamics and fire behavior, risk, analysis, the art and science of firefighting, safety conscious work environment concepts and effective and well-informed incident command management, company level supervision and task level competencies; You are derelict and negligent and “not “everyone may be going home”.

    Take a look at local, regional or national level training offerings and opportunities. Check out on-line offerings and select from the many seminar programs being offered related to building construction, risk management , structural systems, fire dynamics and fire behavior that integrate construction , strategies, tactics, safety, and operational relevant to today’s fireground risks and operational parameters.

    Remember, Building Knowledge = Firefighter Safety.

    Understanding Buildings, Performance & Fire Operations-Random Thoughts

    • There is an acute corollary of technical knowledge and inter reliance on occupancies, construction, strategy, tactics, risk, safety, physics, engineering and fire suppression theory…FACT!

    • There are Fundamental Domains that can be applied

    • The Rules of Combat Structural Firefighting have changed; Didn’t anyone tell you?

    • What about; Structures, Occupancy Types, Construction, Systems, Materials, Size, Height, Dimensions, Volumes, Vintage, Square footage, Resistance, Combustibility, Fire Loadings, Hazards, Occupancy Loads, Compartments, Barriers, Defenses, Protective’s, Inherent, Style, Design, Features, Appearance, Form, Façade, Deceptions, Assumptions, Distance, Proximity, Exposure, Access, Restrictive, Limiting, Vulnerable, Risk, Value, Operations and Safety. What do these mean to you?

    • Do you equate the true limitations of time related to occupancy, structure and fire dynamics and fire load? Or is it just stretching the line and getting in…?

    • Do you truly integrate occupancy risk with operational deployment and task assignments?

    • Does your Incident action plan (IAP) reflect dynamic risk assessment related to the structure and occupancy?

    • Modern building construction is no longer predicable; Do you an appreciation of what impact this has on your strategic or tactical operations?

    • Command & company officer technical knowledge may be diminished or deficient in the areas of building construction; Does your organization have gaps in this area? If so, what can you do to close those gaps and reduce the risk?

    • Technological Advancements in construction and materials have exceeded conventional fire suppression practices, yet we still advocate, train and practice antiquated firefighting principles.

    • Some fire suppression tactics are faulted or inappropriate, requiring innovative models and methods.

    • Fire Dynamics and Fire Behavior is not considered during fireground size-up and assessment

    Risk Management related to building structure and occupancy is either not practiced or willfully ignored during most incident operations

    • Nothing is going to happen to me (us); “we’ve been fighting fires the same way for the past thirty years and we’ve done OK. We don’t need any of this stuff”. Sound familiar; what do you think?

    Some additonal insights; HERE, HERE, HERE, HERE and HERE

    360 Degrees of Separation

    1 comment

    2-21-2009 8-21-40 AM360 Degrees of Separation. The fireground often has competing or conflicting incident priorities, demands or distractions before a complete appreciation of all mission critical or essential information and data has been obtained. The effective assessment of the incident scene is much more than the three-sided size-up methodology of past fireground practices. In fact the term size-up doesn’t align with the newest directions in firefighter safety and incident command management.

    The 360 degree assessment has become the generally accepted standard from which risk assessment is performed and incident action plans derived. The fact that many LODD case studies and reports repeatedly indicate the lack of an effective 360 degree assessment of the incident scene where structural fire engagement is being initiated was a contributing factor or may have contributed to a different incident outcome.

    Think about the effectiveness and value that the 360 ◦ Degree assessment brings to the development of an effective and valid incident action plan and the tactics that are driven by those identified and assumed assessment indicators.The question is: Are you conducting a 360 upon arrival, and if not WHY?

    Remember: All command and supervisory personal and operating companies must be able to recognize and appreciate the risks which are present at an incident in order to carry out an effective dynamic risk assessment. The 360 Degree assessment is a mission critical element for effective and safety incident operations.

    Don’t for a moment think, “it takes too long to perform” or that you don’t have time to conduct, especially from a company officer perspective when you’re deploying and initiating tactical assignments. That extra minute to conduct a “three-sixty” may make all the difference in the world…..There may be three hundred and sixty degrees of safety margin that separate you and your company between injury or death….think about it.